Project Description
MEP Contractor | FEMCO & YUKSEL Consortium |
Location | Dammam, KSA |
End User | |
Client | Rikaz Development Company |
Project Management | |
Consultant | |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 11.2 Million Saudi Riyal |
Start Date | Mar, 2005 |
Finish Date | Aug, 2005 |
Total Land Area | |
Total Built-up Area |
Work Description
Sewage System consisting of Sewage Network & Lifting Stations
Scope of Work
- Supply & Installation of uPVC Pipes, diameter ranging from 150 to 400 mm.
- FRP Pipes from 200 to 800 mm dia. including Valves, Fittings, Inspection Chambers and Manholes.
- Excavation, De-Watering, Leveling, Back-filling, Compacting and Side Slope Protection.
- Construction of Lifting Station and Booster Lifting Station which includes
- Submersible Pumps, Motors, together with Discharge Pipes & Fittings, Check Valve, Gate Valve and Exhaust Ducts.
- Construction of: Fence, Gates, Walkways, Asphalting,
- Guard House, Generator Room, and Electrical Room.
- Architectural Works include Concrete Masonry Units,
- Elastomeric Membrane Roofing System,
- Steel Doors & frames, Aluminum Windows,
- Plastering, Painting, Tiling (interior & exterior) and Toilet Fittings.