Project Description
MEP Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Dammam, KSA |
End User | Ministry of Higher Education |
Client | King Faisal University |
Project Management | University PM |
Consultant | |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 212.84 Million Saudi Riyal |
Start Date | Jun, 2007 |
Finish Date | Nov, 2009 |
Total Land Area | |
Total Built-up Area |
Work Description
Civil, Mechanical, & Electrical Infrastructure Works
Scope of Work
- Site Cleaning with Excavation / Filling of 1,230,000 cu.mtr. of Soil.
- Construction of Roads with 590 Poles of Street Lights, Walkways, & Parking.
- Installation of Sewer &p; Irrigation Piping, and 34 KM of Water Distribution Network.
- Setting up of Sewage Treatment Plant of 1,600 cu.mtr. / day capacity and Sewage Pump Lifting station of 50 LPS. capacity.
- Also Storm Water Pump Station of 250 LPS capacity is constructed.
- Installation of 4 nos. Chiller Plants of 1,300 Tons capacity and
- 3 nos. Cooling Towers of 3,900 GPM capacity,
- Laying of 1.4 KM of Hydronic Pipes, together with Chilled & Condenser Water pumps.
- Installation of R.O Plant of 400 cu. mtr per day capacity.
- Facilities like: Telephone & Computer Data System, Clock System,
- MATV, CCTV Surveillance, CCMS / BMS / Fire Alarm System,
- Sprinklers, FM 200 Fire Suppression System & Fire Hydrants, are included.
- Electrical Works include: Installation of 16 KM of U / G conduits for Elect.
- Cabling.
- 4 nos. of 1,500 KVA Generators for Emergency Power,
- 4 nos. Power Transformers, 1 no. MV Switchgear and
- Installation of 28 KM of 15 KV MV Cables, 2 nos. LV Switchgear,
- MCCs, Power & Lighting Panels, Lighting Transformers.
- 10 KM of LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
- Grounding, Bonding, and Lightning Protection System