Infrastructure in Girls Colleges in Al Rayyan Complex in Dammam

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 349.92 Million Saudi Riyal
Start Date June, 2013
Finish Date Apr, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works, Project is divided to two stages, Package 1 & 2.

Scope of Work

  • Excavation & Backfilling: 115,000 m³ & 52,000 m³
  • Service Tunnel: 5,500 m
  • Chilled Water Piping System: 11,000 m
  • Storm Water Piping System: 4,500 m
  • Sewage Water Piping System: 4,000 m
  • Potable Water Piping System: 9,000 m
  • Domestic Water Piping System: 9,000 m
  • Irrigation Water Piping System: 66,000 m
  • Fire Water Piping System: 10,500 m
  • Data, Voice, CCTV, Public Address, Fire Alarm Networks: 4,200m x 5 = 21,000 m
  • MV Distribution Network: 29,000 m
  • LV Distribution Network: 19,000 m
  • Water Storage Tanks
  • Fire & Domestic Water Tank: 1 no. Capacity 5,304 m³
  • Potable Water Tank: 1 no. Capacity 2,673 m³
  • Irrigation Water Tank: 1 no. Capacity 2,460 m³
  • Raw Water Tank: 1 no. Capacity 550 m³
  • Pump Rooms
  • Domestic Water Pump Room: 3 nos. TDH 6.5 bar, Capacity 555 GPM
  • Fire Water Pump Room: 2 nos. TDH 13 bar, Capacity 1250 GPM
  • Irrigation Water Pump Room: 1 no. TDH 7 bar, Capacity 397 GPM
  • Potable Water Pump Room: 3 nos. TDH 7.5 bar, Capacity 365 GPM
  • Chiller Plant
  • Water Cooled Centrifugal Chiller: 6 nos. Capacity 2,946 TR each (TOTAL 17,676 TR)
  • Closed Circuit Cooling Towers: 5 nos.
  • Chilled & Condenser Water Pumps
  • MV Switchgears
  • Transformers
  • Motor Control Centres

Connection of Buildings of College of Education & Sciences with Girls College in Dammam

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project Building
Total Value (SAR) 33.66 Million Saudi Riyal
Start Date Aug, 2010
Finish Date Mar, 2012
Total Land Area
Total Built-up Area

Work Description

Civil, Architectural and Electro-Mechanical Works

Scope of Work

  • Installation 5000 m22 space frame, and 5000 m2 cover of the steel (sandwich panels)
  • Aluminum works cladding 850 m2, windows and sliding doors
  • Civil works (retaining wall and foundations aand column’s), cement board 2300 m2 granite 2100 m2, interlock 1500 m2.
  • Supply and installaion of 6 pcs Compacted Air Conditioning Units, 19 tone per unit
  • Spiral round duct single wall inside insulation with the feeding opening and the calibration damper
  • Electrical works compact sub-station 1000Kva for transferring from 13.8Kv to 380V 60Hrtz,
  • MDP, DP, Lighting panel and fire alaram system.

Infrastructure for Housing of the University City in Dammam – Phase 3

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 37 Million Saudi Riyal
Start Date Aug, 2010
Finish Date Aug, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • The infrastructure works of the Research Center which include 7 building
  • Sewage, storm, raw, fire, chilled water, water tanks.
  • Fire water tanks, RO plant, Pump Room,
  • Transformer and Switchgears,
  • Irrigation and Landscaping of roads and parks.

Infrastructure for KFU Teaching Hospital Project in Al-Ahsa, Phase-1

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 290.8 Million Saudi Riyal
Start Date Jun, 2010
Finish Date Jun, 2013
Total Land Area 500,000 m2
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure & Utilities Works

Scope of Work

Site Development

    • Excavation & Backfilling: 263,000 m³ & 220,000 m³
    • Concrete Works: 8,000 m³
    • Asphalt Works: 52,000 m²
    • Curbstone: 10,000 m²
    • Chilled Water Piping System:           4,500 m
    • Storm Water Piping System: 800 m
    • Sewage Water Piping System: 2,200 m
    • Potable Water Piping System: 2,200 m
    • Raw Water Piping System: 2,800 m
    • Well Water Piping System: 500 m for 3 nos. deep well
    • Reverse Osmosis (RO) Unit: 2 nos. Capacity 750 m³/day
    • Break Water Tank: 1 nos. Capacity 500 m³

Chiller Plant

    • Water Cooled Centrifugal Chillers: 6 nos. Capacity 2,151 TR each (TOTAL 12,906 TR)
    • Air Cooler Radiators: 44 nos. Capacity 269 TR each (TOTAL 11,836 TR)
    • Primary Chilled Pumps: 8 nos. TDH 2.6 bar, Capacity 3,250 GPM
    • Condenser Water Pumps: 8 nos. TDH 3.7 bar, Capacity 7,300 GPM
    • Secondary Chilled Pumps: 5 nos. TDH 6 bar, Capacity 5,700 GPM
    • Boilers: 4 nos. Capacity 7,710 kg/hr

Generator Plant

    • Generators: 5 nos. Capacity 2500kVA each
    • MV Switchgear: 1 no. 13.8 kV, 2500 kVA

Pump Rooms

    • Raw Water Pump: 4 nos. TDH 9.5 bar, Capacity 161 GPM
    • Irrigation Water Pump: 3 nos. TDH 6.5 bar, Capacity 250 GPM
    • Fire Pump: 2 nos. TDH 13.5 bar, Capacity 47 GPM

Jeddah RO III (DHI / JedRO / SA / MSE / OOI) (240 Million Liters Per Day) – Doosan

Project Description

Main Contractor Doosan Heavy Industries & Construction
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 57.94 Million Saudi Riyal
Start Date Jul, 2009
Finish Date Sep, 2013
Total Land Area
Total Built-up Area

Work Description

Electrical, Mechanical, & Civil Works for Taprogge Filters

Scope of Work

Progress of Equipment and Piping installation

  • Sea Water Supply Pumps and Screening Equipment
  • Air Compressor System
  • Cartridge Filters
  • Electro Chlorinator Systems
  • Ferric & Polymer Dosing System
  • DMF Back Wash Pumps
  • Filtered Water Pumps
  • Steel Structure (Platform, Pipe Rack, etc.)
  • RO Building: 1st Pass Booster HP Pumps, Turbo Charger, Permeator Pressure Vessels
  • Electrical, Instrumentation & Control system
  • Electrical Equipment: 90 MVA, 380kV GIS and 380/13.8k Transformers
  • 13.8kV and 480V Switchgears, UPS, Rectifiers, 13.8kV/480V Aux.
  • Transformers Cable Trays and bridges.
  • Testing and Commissioning

Site Development Base Plan for the University City in Dammam

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 45.13 Million Saudi Riyal
Start Date Jun, 2008
Finish Date Aug, 2010
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Supply, installation and testing and communication for infrastructure work for housing accommodation area
    of the new campus
  • Irrigation network with all accessing including control system
  • Raw, sweet, sewage and storm water networks
  • Fiber optic networks for all low current voltage systems
  • BMS, CCTV, Data, Telephone Network System
  • Medium voltage and low voltage cable network
  • Transformers and substations
  • External lighting
  • Road and park including backfilling, sub base, base course, and asphalting
  • Slope protection and interlock

Preparation of Infrastructure for the University City in Al-Ahsa, Phase-3, Stage-1 (King Faisal University Permanent Campus in Al-Ahsa)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 600.95 Million Saudi Riyal
Start Date Aug, 2007
Finish Date Dec, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works for Four (4) Sub – Packages as detailed below

Scope of Work

  • Excavation & Backfilling: 428,000 m³ & 1,028,000 m³
  • Concrete Works: 50,000 m³
  • Asphalt Works: 325,000 m²
  • Chilled Water Piping System: 14,800 m
  • Sweet Water Piping System: 9,000 m
  • Sewage Water Piping System: 10,000 m
  • Storm Water Piping System: 13,500 m
  • Raw Water Piping System: 12,000 m
  • Reverse Osmosis (RO) Unit Capacity 3,500 m³/day
  • Sewage Treatment Plant Capacity 3,770 m³/day (2 duty + 1 standby)
  • Chiller Plant
  • Water Cooled Centrifugal Chillers (Multi Stage): 9 nos. Capacity 3,150 TR each (TOTAL 28,350 TR)
  • Evaporator Flow: 3,900 GPM,
  • Water Entering Temp. 58°F
  • Water Leaving Temp. 38°F”
  • Open Circuit Cooling Towers: 8 nos. Capacity 9290 GPM
  • Primary Chilled Pumps: 7 nos. TDH 13.7 bar, Capacity 3,877 GPM
  • Condenser Water Pumps: 7 nos. TDH 4.5 bar, Capacity 9,290 GPM
  • MV Switchgear 13.8 kV
  • Generator Plant
  • Emergency Generators: 2 nos. Capacity 1,000kVA each
  • Diesel Generators: 2 nos. Capacity 1000kW
  • Motor Control Centers (MCC)
  • Street Lighting
  • Panel Boards
  • Grounding and Lightning Protection
  • Pump Rooms
  • SCADA System controlling all campus utility buildings
  • BMS System controlling all Colleagues Building

Preparation of Infrastructure for the University City in Dammam Second Phase (King Faisal University Permanent campus in Dammam)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 212.84 Million Saudi Riyal
Start Date Jun, 2007
Finish Date Nov, 2009
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Site Cleaning with Excavation / Filling of 1,230,000 cu.mtr. of Soil.
  • Construction of Roads with 590 Poles of Street Lights, Walkways, & Parking.
  • Installation of Sewer &p; Irrigation Piping, and 34 KM of Water Distribution Network.
  • Setting up of Sewage Treatment Plant of 1,600 cu.mtr. / day capacity and Sewage Pump Lifting station of 50 LPS. capacity.
  • Also Storm Water Pump Station of 250 LPS capacity is constructed.
  • Installation of 4 nos. Chiller Plants of 1,300 Tons capacity and
  • 3 nos. Cooling Towers of 3,900 GPM capacity,
  • Laying of 1.4 KM of Hydronic Pipes, together with Chilled & Condenser Water pumps.
  • Installation of R.O Plant of 400 cu. mtr per day capacity.
  • Facilities like: Telephone & Computer Data System, Clock System,
  • MATV, CCTV Surveillance, CCMS / BMS / Fire Alarm System,
  • Sprinklers, FM 200 Fire Suppression System & Fire Hydrants, are included.
  • Electrical Works include: Installation of 16 KM of U / G conduits for Elect.
  • Cabling.
  • 4 nos. of 1,500 KVA Generators for Emergency Power,
  • 4 nos. Power Transformers, 1 no. MV Switchgear and
  • Installation of 28 KM of 15 KV MV Cables, 2 nos. LV Switchgear,
  • MCCs, Power & Lighting Panels, Lighting Transformers.
  • 10 KM of LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
  • Grounding, Bonding, and Lightning Protection System

Preparation of Infrastructure for the University City in Dammam Phase 4 & 6, Utility Works. (King Faisal University Permanent Campus in Dammam)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Saud Consult
Type of Project District Cooling & Infrastructure
Total Value (SAR) 101.39 Million Saudi Riyal
Start Date Mar, 2005
Finish Date Nov, 2007
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Excavation & Back-filling of 1,362,694 cu. mtr. of Soil,
  • Construction of 107,700 LM of Flexible Pavements
  • 92,200 LM of Curbs & Gutters and 61,000 sq. mtrs. of Sidewalks.
  • 769 LM of Underground Piping (FRP) were laid, and Water Tank of 1,800 cu.mtr. was constructed.
  • R.O Plant of 600 cu.mtr. / day capacity was installed with Water Well and 14.13 KM of Water Network Piping.
  • Sewage Treatment Plant (STP) and Sewage Lift Station is provided with
  • Installation of 5.12 KM of Sanitary Sewage Piping.
  • 5.34 KM of Irrigation Piping has been laid.
  • 50 mtrs. of LPG Pipes (above ground) have been installed with 2 nos. of LPG Tanks of 40,000 USG capacity.
  • 2 nos. of Centrifugal Chillers and 2 nos. of Cooling Towers have also been erected.
  • Electrical Works include: Installation of Power & Distribution Transformers,
  • LV Switchgear, and Street Lighting Poles
  • Communication & Data Processing Equipment, Telephone & Inter-com System.
  • Building Automation & Controls and Security Surveillance System were also added.