Supplementation of Infrastructure for University City (Development of HVAC System)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 27.86 Million Saudi Riyal
Start Date May, 2018
Finish Date Sep, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
  • Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
  • Filtration System: 20 nos. Capacity 54 m³/hr
  • Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
  • Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
  • Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
  • Standby Diesel Generator: 1 nos. 1,500 kVA
  • Transformer, Ring Main Unit, Low Voltage Switchgear, Motor Control Center (MCC) installation, Aboveground & Underground chilled water piping including valves and fittings.

Infrastructure for the Preparatory Year in Faysaliyah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 63.8 Million Saudi Riyal
Start Date Nov, 2017
Finish Date May, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Work Summary: Infrastructure work for the existing and new building in Al Faysaliyah King Abdulaziz University Campus, work including all civil works and complete electro-mecanical work for chiller plant with mechanical and electrical net works as bellow:

  • Water Cooled Centrifugal Chillers: 11 nos. Capacity 560 TR each (TOTAL 6,160 TR)
  • Chilled Water Primary Pumps: 7 nos. TDH 3 bar, Capacity 2,300 GPM
  • Chilled Water Secondary Pumps: 7 nos. TDH 5 bar, Capacity 1,900 GPM
  • Expansion Tanks: 4 nos. Capacity 900 Gallon
  • Heat Exchangers: 11 nos. 1,750 kW
  • Aboveground and Underground Chilled Water Piping: 3,500 m
  • Sewage Piping System: 2,500 m
  • Potable and Fire Water Piping System: 2,500 m
  • Fire Pumps: 2 nos. TDH 6 bar, Capacity 317 GPM
  • Fire Pump: 1 nos. TDH 8 bar, Capacity 1,000 GPM
  • MV Switchgears: 4 nos. 13.8 kV
  • Transformers: 2 nos. 13.8 / 0.4 kV
  • Emergency Generator: 6 nos. 800 kVA

Completion of Infrastructure for Housing of University City (Generators & Synchronization Panel)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 36.86 Million Saudi Riyal
Start Date Oct, 2017
Finish Date Dec, 2018
Total Land Area
Total Built-up Area

Work Description

Civil & Electrical Work

Scope of Work

Generator Plant

  • MV Generators with Battery Charger: 9 nos. Capacity 3,500 kVA, 13,8 kV
  • Synchronization Panel of MV Generators: 1 nos. Capacity 17.5 KV, 1250 A, 25KA/3SEC
  • Hoisting Cranes: 2 nos. Lifting Capacity 15 ton
  • Data, Telephone IP System and CCTV System
  • BMS
  • Firefighting & Fire Alarm System

Infrastructure Works for Projects of King Abdulaziz University Northern Area – Wadi Jeddah

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Wadi Jeddah
Client Wadi Jeddah
Project Management Fluor Consultants
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 291.39 Million Saudi Riyal
Start Date May, 2016
Finish Date May, 2018
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical and Instrument Work.

Scope of Work

  • Water Cooled Centrifugal Chillers: 12 nos. Capacity 2,185 TR each (TOTAL 26,220 TR)
  • Fluid Coolers draft type with dual axial fans and coils: 60 nos. fans total and 4.88 m dia.
  • Chilled Water Pumps: 12 nos. TDH 2 bar, Capacity 4,548 GPM
  • Condenser Water Pumps: 12 nos. TDH 3.5 bar, Capacity 7,147 GPM
  • Distribution Pumps: 6 nos. TDH 7 bar, Capacity 10,700 GPM
  • Isolating Valves: 422 nos. up to 1,050 mm dia.
  • Chilled Water Piping: 6,000 m total
  • Transformers Dry Type: 6 nos. Capacity 13.8 / 0.38 kV
  • Motor Control Centers (MCC)
  • Area Lighting
  • Panel Boards
  • Grounding and Lightning Protection

Project of Supplementation of Infrastructure for the University City Third Phase (Lift Station)

Project Description

MEP Contractor FEMCO & Sasel Saudi Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 19.52 Million Saudi Riyal
Start Date Aug, 2014
Finish Date Mar, 2016
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical, Mechanical and Instrument works.

Scope of Work

  • Gravity Pipeline; Catch Basins for GRP. GRP pipes 400, 600, 700, 800, 900, 1000, 1200mm dia. GRP manholes having 1200, 1500mm dia.
  • Lift Station; Excavation support secant piles.Total 1612m2 wall to be constructed.Tension piles underneath the lift station.Ductile Iron Pipe and fittings to be supplied and installation. Submergible pumps with motor and control panel, vapor barrier membrane, Compartment System waterproofing, ceiling mounted weather proof fluorescent lighting fixture, grounding, MV cables.
  • Force Main Pipeline; Supply and laying and install GRP pipe with Air Release Valve.
  • Electrical Room construction for Generator; Construction of Electrical room for Generator and Package substation, Supply and install the Package Substation and one unit of the Generator with storage fuel tank, Underground FRP fuel, Auto Transfer switch, grounding, MCC and ICP.

Upgrading of Medium Voltage Distribution Network (4160) Volt and the Protection System for the Local Generation Station at the Central Services Complex

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 22.26 Million Saudi Riyal
Start Date May, 2014
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Electrical Replacement Works

Scope of Work

  • Generator protection update, Battery charger for Turbine Generators,
  • UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V,
  • Potential Transformer (type Tested) Metal Enclosed,
  • Automatic transfer switch with enclose 600A & 400A, (MCC’s) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters),
  • Single core cable (1×240, 1×95, 1×70, 1×35, 1x16mm2) CU-XLPE/PVC-5K.v, (1×70, 1×35, 1×10 mm2) CU-PVC-600v,
  • Instrumentation cable 16AWG XLP/PVC,
  • Control cables 12 AWG XLP/CPE, Station (start-stop Emergency),
  • Chiller distribution panel 380/220V (DP-3),
  • Motor control center for chiller auxiliary,
  • L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V,
  • Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.

Replacement of Medium Voltage Panels 13.8 kV from Pump Station 1 to Pump Station 4 for Line C and Replacement of the Bus Duct feeding the Panel in Pump Station 1

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail – Riyadh, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 12.95 Million Saudi Riyal
Start Date Apr, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Electrical Works

Scope of Work

  • Removal existing and new installation of MV Panels Pump Station 1 to Pump Station 4.
  • Removal existing and new installation of MV Bus Duct.
  • Termination, testing and commissioning.

Replacement and Development of Infrastructure for King Khalid Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Kharj, KSA
End User Ministry of Health
Client King Khalid Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 97.75 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2019
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement and Development of Infrastructure for Jubail General Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Jubail, KSA
End User Ministry of Health
Client Jubail General Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 71.99 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

P&C for Sea Water Pump Station (201-C01)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant Bechtel
Type of Project Water & Power
Total Value (SAR) 429.33 Million Saudi Riyal
Start Date Dec, 2013
Finish Date Jul, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works. The pumping station shall pump 75.000 m3 / hr sea water to the system network for Ras Al Khair Industrial City when completed.

Scope of Work

Sea Water Cooling Pump Station

  • Vertical Mixed Flow Pump: 4 nos. Capacity 15,000 m³/hr. each (TOTAL 60,000 m³/hr.).
  • Mechanical Bar Screen: 4 nos. Capacity 15,000 m³/hr. Clearing Space between bars 80 mm.
  • Travelling Band Screen: 4 nos. Capacity 15,000 m³/hr. Screening Aperture Size 5×5 mm.
  • FRP/GRP Water Piping including Valves and Fittings: 1,780 m up to 3,300 mm dia.
  • Overhead Crane: 1 no. Lifting Capacity 40 ton.
  • Excavation and Backfilling: 45,000 m³ and 5,000 m³.
  • Concrete: 18,000 m³.

HYPOCHLORITE Generation Building

  • Sodium Hypochlorite Generators: 3 nos. Capacity 540 kVA.
  • Seawater flow through one Generator: 50 m³/hr.
  • Hypochlorite Production: 100 kg/h.
  • Hypochlorite Concentration: 2,000 ppm.
  • Seawater Booster Pump: 2 nos. TDH 1.8 bar Capacity 528 GPM.
  • Automatic Self-Cleaning Filters: 2 nos. Capacity 528 GPM.
  • Sodium Hypochlorite Storage FRP Tank: 2 nos. Capacity 80 m³.
  • SEC 115 kV Power Supply: Including design & engineering works of 115kV cabling system.

Site Development

  • Intake Dredging Works: 200,000 m³ Dredging of intake canal.
  • Shoreline Rip Rap Protection: 9,300 m².
  • Shoreline Interlocking: 1,800 m².
  • Toe-Down to Dredged Channel: 600 m³.
  • Grading: 200,000 m².
  • Surfacing: 5,000 m².
  • Asphalt: 12,000 m²
  • Jelly Fish Basin: Length 100 m, Width 60 m and Depth 2 m.
  • Cofferdam Temporary Works: 60 x 100 m.
  • Staff Control Building
  • Switchgear Building
  • Workshop Building
  • Guard House
  • SEC Building.