Furnish, Install, Test & Commissioning of Water Cooled Centrifugal Chillers and Vapor Absorption Chillers in AC Station

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dhahran, KSA
End User Ministry of Higher Education
Client King Fahd University of Petroleum and Minerals
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.05 Million Saudi Riyal
Start Date May, 2013
Finish Date Nov, 2014
Total Land Area
Total Built-up Area

Work Description

Mechanical Replacement Works

Scope of Work

  • Supply, Installation and Testing & Commissioning of 4 nos. Water Cooled Centrifugal Chillers 550 TR capacity each (TOTAL 2,200 TR)
  • Supply, Installation and Testing & Commissioning of 1 no. Water Cooled Centrifugal Chiller 750 TR capacity.
  • Supply, Installation and Testing & Commissioning of 2 nos. Fire Absorption Liquid Chillers 200 TR capacity each (TOTAL 400 TR).
  • Supply, Installation and Testing & Commissioning of 2 nos. Fire Absorption Liquid Chillers 250 TR capacity each (TOTAL 500 TR).

Refurbishment Works of Jeddah Phase 4 – Desalination Plant

Project Description

Main Contractor ACWA Power SASAKURA (APS)
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 40.5 Million Saudi Riyal
Start Date Sep, 2004
Finish Date Apr, 2007
Total Land Area
Total Built-up Area

Work Description

Rehabilitation Works of Evaporator Tube Bundles and modification of Vacuum System

Scope of Work

  • Removal and Replacement of Brine Pipes, Sea Water Pipes, Water boxes, Demisters & Manhole Covers.
  • Tube Bundles Demolishing & Replacement.
  • Removal and Replacement of: Vent Pipes, Tube Sheets Necks, Tube Support Plates and Intermediate Tube Sheets.
  • Insertion & Expanding of 53,200 nos. of 90/10 Cu.Ni. Tubes (O.D 19 mm x 25000 mm length.) with subsequent
    Leakage Test using Pressure Air.
  • Cleaning, Rust Removal, Sandblasting, & Coating Works.
  • Lining Works ( mounting SS lining material on evaporated internal surface above Demister for Corrosion Protection
    after cleaning )
  • Modification of Evaporator Venting & Vacuum System, Brine Gate Cover and inspection of Brine Heater Tubes.
  • Replacement of Pump Suction & Discharge Valves and Leakage Test.
  • All related Elect. & Instrumentation Works.