Interior Fit‐Out and Furnishing of Currie & Brown Office, Riyadh

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Currie & Brown
Client Currie & Brown
Project Management IDS Development Management and Consultancy
Consultant IDS Development Management and Consultancy
Type of Project Office Building
Total Value (SAR) 0.75 Million Saudi Riyal
Start Date Jan, 2020
Finish Date Oct, 2020
Total Land Area
Total Built-up Area 650 m2

Work Description

Interior Design and Electrical & Mechanical Works

Scope of Work

  • Supply and Construction of Glass Partitions
  • Supply and Construction of Gypsum Wall Partitions & Ceiling Works
  • Rehabilitation and Improvement of HVAC System
  • Rehabilitation and Improvement of Fire Sprinkler & Fire Alarm System
  • Rehabilitation and Improvement of IP Data System
  • Rehabilitation and Improvement of CCTV System
  • Rehabilitation and Improvement of Access Control System
  • Rehabilitation and Improvement of Power Distribution System
  • Supply and Assembly of All Office Furnitures

Mechanical Works for Steam Boilers Network in Medical Center

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 8.1 Million Saudi Riyal
Start Date Nov, 2018
Finish Date Nov, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Renovation of Boiler Building Replacement of doors and windows,
  • Plastering, painting, ceiling and roof insulation system works.
  • Replacement of (3) nos. Diesel type Steam Boiler
  • Supply, installation, testing & Commissioning of (2) nos. Electric type Steam Boilers and (1) no. Gas type Steam Boiler with steam capacity 1.5 ton/hr.
  • Rehabilitation of (2) nos. Steam Pumps.
  • Supply, installation, Testing & Commissioning of AHU & ducting,
  • RO Unit, Water Softener Unit, Pumps, pipe & fittings and valves,
  • Boiler Plant Fire Fighting System,
  • BMS, Main Distribution Board, cable and cable trays.
  • Underground existing High Pressure Steam Line Test (X-RAY and REPLICA)

Replacement of the Halon Gas With (NOVEC 1230) Metarials – Phase 2

Project Description

Contractor FEMCO & PAN GULF Consortium
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 34.29 Million Saudi Riyal
Start Date Dec, 2014
Finish Date Jan, 2018
Total Land Area
Total Built-up Area

Work Description

Electro-Mechanical Works

Scope of Work

  • Halon system (SEVO – NOVEC 1230) equipment & piping replacement work including detection & extinguish high system

Modification of Bearing Cooling System for the Main Sea Water Pumps in Pump Station 1 & 2 Al-Jubail

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Client Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Project Management
Consultant
Type of Project Water & Power
Total Value (SAR) 6.76 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical & Instrumentation works

Scope of Work

Engineering Procurement Construction contract for Upgrade & Automation of Bearing cooling system for Main Seawater Pumps.

Upgrading of Medium Voltage Distribution Network (4160) Volt and the Protection System for the Local Generation Station at the Central Services Complex

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 22.26 Million Saudi Riyal
Start Date May, 2014
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Electrical Replacement Works

Scope of Work

  • Generator protection update, Battery charger for Turbine Generators,
  • UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V,
  • Potential Transformer (type Tested) Metal Enclosed,
  • Automatic transfer switch with enclose 600A & 400A, (MCC’s) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters),
  • Single core cable (1×240, 1×95, 1×70, 1×35, 1x16mm2) CU-XLPE/PVC-5K.v, (1×70, 1×35, 1×10 mm2) CU-PVC-600v,
  • Instrumentation cable 16AWG XLP/PVC,
  • Control cables 12 AWG XLP/CPE, Station (start-stop Emergency),
  • Chiller distribution panel 380/220V (DP-3),
  • Motor control center for chiller auxiliary,
  • L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V,
  • Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.

Replacement of Medium Voltage Panels 13.8 kV from Pump Station 1 to Pump Station 4 for Line C and Replacement of the Bus Duct feeding the Panel in Pump Station 1

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail – Riyadh, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 12.95 Million Saudi Riyal
Start Date Apr, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Electrical Works

Scope of Work

  • Removal existing and new installation of MV Panels Pump Station 1 to Pump Station 4.
  • Removal existing and new installation of MV Bus Duct.
  • Termination, testing and commissioning.

Replacement and Development of Infrastructure for King Khalid Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Kharj, KSA
End User Ministry of Health
Client King Khalid Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 97.75 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2019
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement and Development of Infrastructure for Qatif Central Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Qatif, KSA
End User Ministry of Health
Client Qatif Central Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 66.72 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement and Development of Infrastructure for Jubail General Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Jubail, KSA
End User Ministry of Health
Client Jubail General Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 71.99 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement and Development of Infrastructure for King Fahad Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Health
Client King Fahad Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 175.2 Million Saudi Riyal
Start Date Dec, 2013
Finish Date Jun, 2019
Total Land Area
Total Built-up Area 45,000 m2

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.