Riyadh – Qassim Water Transmission System Station & Terminal Construction – 4

Project Description

Main Contractor Yuksel Insaat Saudia Co. Ltd.
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Qassim, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 9 Million Saudi Riyal
Start Date May, 1998
Finish Date Jun, 2001
Total Land Area
Total Built-up Area

Work Description

Electrical – Mechanical Erection Works

Scope of Work

  • Installation of 26 nos., 26 mtrs. high, weighing 56 Tons each of Surge Vessel – dia. 2,300 mm & capacity 220 cu. mtrs. with all Auxiliary Air & Water Piping, of size ranging from 2″ to 48“.
  • Structure designed to withstand wind load with peak wind velocity of 45 cm per sec. (gust included) and with max. 80 deg. C0. metal temperature under direct Sun.
  • Installation of Compressor Units, 48” dia. Motor Operated Valves, and 26 Tons Relief Valve Skid.
  • Installation of HVAC, Fire Alarm, Fire Protection System at all Buildings.
  • Laying & Termination of Cables for Power, Instruments & Controls.
  • Supply & Installation of Lighting System at all areas.
  • Installation of Electricals & Instrumentation at Surge Vessel Area & Terminal building.
  • Testing & Commissioning of All Systems.

Yanbu Medina Water Transmission System Phase 2 – Housing Compound

Project Description

Main Contractor Yuksel Insaat Saudia Co. Ltd.
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management
Consultant
Type of Project Building
Total Value (SAR) 45 Million Saudi Riyal
Start Date Aug, 1997
Finish Date Jul, 2002
Total Land Area
Total Built-up Area

Work Description

Providing Facilities for Housing Compound (18 Units of 3 Storied Buildings Total 108 Flats)

Scope of Work

  • Drainage, Plumbing Facilities including Supply and Installation of Sanitary Fixtures
  • Fire Fighting, Potable Water and HVAC System
  • Supply, Installation & Commissioning of Sewage Treatment Plant.
  • Supply & Installation of Elect. Sub-station, Panel Boards, Lighting System, Fire Alarm System, Inter-com System, & Sound System.
  • MV / LV Power Distribution Network.
  • Grounding & Lightning Protection System

HADEED D.R. Plant Module ‘C’ Shutdown

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client HADEED / GAMA
Location Jubail, KSA
Total Value (SAR) 625,000 SAR
Start Date Jul, 1997
Finish Date Sep, 1997

Work Description

Industrial Maintenance

Mechanical, Electrical & Instrumentation Installation Contract for Universal Metal Coating Co. (Unicoil)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Universal Metal Coating Co. (Unicoil
Client Universal Metal Coating Co. (Unicoil)
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 6.3 Million Saudi Riyal
Start Date Nov, 1996
Finish Date Nov, 1997
Total Land Area
Total Built-up Area

Work Description

Installation of Equipment for Metal Coating Plant

Scope of Work

  • Installation of Process Machinery (Mech. & Hydraulic), with 91 Tons of Steel Structure.
  • Erection of Mechanical Equipment viz. Compressors, Dryers, Pumps, Chemical Coating / Painting System and Chemical Injection Control System.
  • Installation of All Pipelines (including Inter-connecting Piping to Machines) with Utility Pipe Supports.
  • Supply & Installation of seven (7) nos. Exit / Entry Accumulator Towers, Coater Room Equipment (Flame Proof)
  • Installation of HVAC System, including Hot & Cold Duct Works.
  • Installation of Fire Fighting Sprinkler System, Fire Alarm, Fire Protection & Monitoring System, and FM 200 Fire Extinguishing System.
  • Erection of Transformers, Isolators, MCCs & other Control Systems and all Grounding Works.
  • Installation of CCTV, Video Camera, Monochrome Monitor & Public Address System.
  • Installation of 36.5 KM of LV Power / Control / Instrument Cables, and 38 KM of Wiring with Fixtures.

Maintenance Works for H.R.H. Prince Sultan Bin Fahd Palace

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client H.R.H. Prince Sultan Bin Fahd Palace
Location Riyadh, KSA
Total Value (SAR) 480,000 SAR
Start Date Aug, 1996
Finish Date Sep, 1999

Work Description

Industrial Maintenance

NAMA Caustic Soda Plant Steel Structure Erection

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client NAMA / GAMA
Location Jubail, KSA
Total Value (SAR) 300,000 SAR
Start Date Jun, 1996
Finish Date Oct, 1996

Work Description

Industrial Maintenance

Al-Sayed Sons Villas External Lighting

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Al – Sayeed & Sons / ICCC
Client Al – Sayeed & Sons / ICCC
Project Management
Consultant
Type of Project Building
Total Value (SAR) 1.2 Million Saudi Riyal
Start Date Jun, 1996
Finish Date Nov, 1997
Total Land Area
Total Built-up Area

Work Description

External (Garden) Lighting

Scope of Work

  • All External Lighting (garden lighting) system; Design, Supply and Installation of three villas.

Yanbu Desalination and Power Plant – Phase 2

Project Description

Main Contractor Yuksel Insaat Saudia Co. Ltd.
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 2.7 Million Saudi Riyal
Start Date Sep, 1995
Finish Date Jun, 1996
Total Land Area
Total Built-up Area

Work Description

Electro – Mechanical Works for Chimney Housing Compound

Scope of Work

Chimney:

  • Electro – Mechanical Works on Plant Chimney (95 Mtrs. Height).
  • Installation of Gas Ducts and Insulation Works for Boilers.
  • Supply & Installation of Lighting, Power, Lightning Protection and Grounding Works.
  • Piping, Sanitary, & Plumbing Works.

Housing Compound:

  • Mechanical, Plumbing, & HVAC, Works for Restaurant Building, and Housing.
  • Electrical Works – Lighting & Power.

HADEED D.R. Plant Modules A/B Shutdown

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client HADEED / GAMA
Location Jubail, KSA
Total Value (SAR) 485,000 SAR
Start Date Sep, 1995
Finish Date Oct, 1995

Work Description

Industrial Maintenance

Electro-Mechanical Works for Jubail – Riyadh Line ‘C’ High Point Terminal

Project Description

Main Contractor Yuksel Insaat Saudia Co. Ltd.
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 12.4 Million Saudi Riyal
Start Date Sep, 1995
Finish Date Dec, 1999
Total Land Area
Total Built-up Area

Work Description

Electro – Mechanical Works for SWCC Reservoir & Terminal

Scope of Work

  • Erection of Steel Structure.
  • Erection of Equipment, including Over-head Cranes.
  • Piping Works for Irrigation Lines, Utility Water Lines, and 1.8 KM of Product Water line of 20″ to 80″
  • Relief Valves of 12″ & 14″ dia. and Motor Operated Valves of 2″ to 80″ dia.
  • Erection of Product Water Chlorination and Dosing Equipment.
  • Erection of Water Quality Metering & Monitoring Equipment.
  • Installation of Station Water Supply System.
  • Sewage Treatment Plant Works.
  • All Electrical Works including: Installation of Building Lighting & Socket Outlet System.
  • Generator, and Instrument & Control System.
  • Installation of Fire Fighting and Fire Suppression System FM 200.