Boundary Walls & Gates of the University

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project Building
Total Value (SAR) 33.71 Million Saudi Riyal
Start Date Nov, 2012
Finish Date Jun, 2014
Total Land Area
Total Built-up Area

Work Description

Civil, Structural, Architectural and Electro-Mechanical Works

Scope of Work

  • UOD Hospital area main gate building & 8 km boundary wall with four secondary access gates.
  • Civil works such as concrete pilling, concrete structure, precast, boundary wall, providing gate barriers and all finishing
  • Electrical works such as lighting, power distribution, MV equipment’s, fire alarm,
  • Boundary wall lighting and security CCTV network, telephone & data works
  • Mechanical works such as utility connection to network for potable, seweage & fire water.
  • Package air conditioning & HVAC distribution ducts, storm water network and building plumbing works.

Equipping the Students Laboratories for the Preparatory Year in the University

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project Building
Total Value (SAR) 4.81 Million Saudi Riyal
Start Date May, 2012
Finish Date Nov, 2012
Total Land Area
Total Built-up Area

Work Description

Design, providing & Putting services all laboratory furniture’s for STEM CELL labs including benches, fume hoods & utilities connections

Scope of Work

Design, providing & Putting services all laboratory furniture’s for STEM CELL labs including benches, fume hoods & utilities connections

Addition of Chillers for Enhancement of the Air-conditioning in King Khalid Medical City in King Saud University

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 21.67 Million Saudi Riyal
Start Date Feb, 2012
Finish Date Nov, 2013
Total Land Area
Total Built-up Area

Work Description

Mechanical & Electrical Works

Scope of Work

  • Closed Loop Type Cooling Towers: 9 nos. heat rejection 7,497,000 BTU / Hr each water flow 1,500 GPM, 60HP fan motor.
  • Water-Cooled Centrifugal Chillers: 3 nos. Capacity 1,500 TR each (TOTAL 4,500 TR).
  • Chilled Water Pumps: 3 nos. centrifugal constant flow double suction split case type water flow rate 2,000 GPM @126ft.TDH, 200 HP motor, including control panel.
  • Condenser Pumps: 3 nos. centrifugal constant flow double suction split case type water flow rate 4,500 GPM @130ft.TDH, 300 HP motor, including control panel.
  • Supply and Install One Distribution Pump Centrifugal Constant Flow Double Suction Split Case Type Water Flow Rate: 4,400 GPM @100ft.TDH, 200 HP motor, including control panel.

Pertaining to Installation of New Steel Pipe for Al Ghat – Buraida Pipeline Ring Road Crossing. SWCC/RQWTS – Al Ghat to Buraida Pipeline

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Ghat, Buraidah, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 23.58 Million Saudi Riyal
Start Date Jan, 2012
Finish Date Dec, 2012
Total Land Area
Total Built-up Area

Work Description

Piping works

Scope of Work

  • Installation of 64” Product Carbon Steel Pipes
  • Installation of 80″ Sleeve Carbon Steel Pipes
  • Thrust boring works.
  • FEB & 3 layer coating
  • Cathodic Protection

Jeddah SWRO III Project (240 Million Liters Per Day) – WETICO

Project Description

Main Contractor WETICO
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Saline Water Conversion Corporation (SWCC)
Client WETICO
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 34 Million Saudi Riyal
Start Date Aug, 2011
Finish Date Sep, 2013
Total Land Area
Total Built-up Area

Work Description

Electro-Mechanical Works

Scope of Work

  • RO Trains 1st & 2nd Pass, 254 SMO & 316 L stainless pipes fabrication and erection work
  • RO Trains rack installation
  • Pressure Vassals (4,464 nos.) & Membrane (13,168 nos.) installation works.
  • HP high pressure pump installation.
  • Static mixer, valves, flow metersetc. installation.
  • Flushing and product pumps installation.
  • CIP system, Carrier water system and Calcium Hypoclorite system pumps & erection works.
  • Utilities piping works
  • Electrical & Instrumentation Control system erection works.
  • Grouting works for electro-mechanical activities

Development & Expansion of Central Chiller at King Saud University

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 149.5 Million Saudi Riyal
Start Date Apr, 2011
Finish Date Apr, 2014
Total Land Area
Total Built-up Area

Work Description

Development & Expansion of Central Chiller

Scope of Work

  • Replacement of Water-Cooled Centrifugal Chillers: 6 nos. Capacity 5,000 TR each (TOTAL 30,000 TR).
  • Replacement of Chilled Water Pumps: 7 nos. TDH 8.2 bar, Capacity 7500 GPM
  • Replacement of Condenser Water Pumps: 7 nos. TDH 3 bar, Capacity 10,500 GPM
  • Overhead Crane: 1 no. Lifting Capacity 60 ton.

Preparation of Infrastructure for the University City in Al-Ahsa, Phase-4 (King Faisal University Permanent Campus in Al-Ahsa)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 143.07 Million Saudi Riyal
Start Date Mar, 2011
Finish Date Jun, 2013
Total Land Area
Total Built-up Area

Work Description

The Infrastructure Phase-4 Stage–1 A project is located along the Academic Area, East Loop Road, West Loop Road, Road-A, Male’s Dormitory Area, and Female’s Dormitory Area of King Faisal University Campus, Al – Ahsa.

Scope of Work

  • Roads & Street Improvement Works: 285,000 m²
  • Landscape & Hardscape Works: 90,000 m²
  • Sanitary Sewer Piping System: 3,300 m
  • Storm Water Drainage Piping System: 6,500 m
  • Raw Water Piping System: 4,800 m
  • Sweet Water Piping System: 2,600 m
  • Well Water System: 4 nos. deep wells
  • Chilled Water Piping System: 800 m
  • Providing full operation preventive maintenance and overall maintenance for electro-mechanical network systems for campus & around 15 campus buildings.

Connection of Buildings of College of Education & Sciences with Girls College in Dammam

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project Building
Total Value (SAR) 33.66 Million Saudi Riyal
Start Date Aug, 2010
Finish Date Mar, 2012
Total Land Area
Total Built-up Area

Work Description

Civil, Architectural and Electro-Mechanical Works

Scope of Work

  • Installation 5000 m22 space frame, and 5000 m2 cover of the steel (sandwich panels)
  • Aluminum works cladding 850 m2, windows and sliding doors
  • Civil works (retaining wall and foundations aand column’s), cement board 2300 m2 granite 2100 m2, interlock 1500 m2.
  • Supply and installaion of 6 pcs Compacted Air Conditioning Units, 19 tone per unit
  • Spiral round duct single wall inside insulation with the feeding opening and the calibration damper
  • Electrical works compact sub-station 1000Kva for transferring from 13.8Kv to 380V 60Hrtz,
  • MDP, DP, Lighting panel and fire alaram system.

Infrastructure for Housing of the University City in Dammam – Phase 3

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 37 Million Saudi Riyal
Start Date Aug, 2010
Finish Date Aug, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • The infrastructure works of the Research Center which include 7 building
  • Sewage, storm, raw, fire, chilled water, water tanks.
  • Fire water tanks, RO plant, Pump Room,
  • Transformer and Switchgears,
  • Irrigation and Landscaping of roads and parks.

Research Centers Project – University City – Dammam

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management
Consultant
Type of Project Building
Total Value (SAR) 21.89 Million Saudi Riyal
Start Date Jun, 2010
Finish Date May, 2012
Total Land Area
Total Built-up Area

Work Description

Civil, Structural and Electro-Mechanical Works

Scope of Work

  • Building of the new campus main gate with 3 secondary gates with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.