Replacement and Development of Infrastructure for King Khalid Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Kharj, KSA
End User Ministry of Health
Client King Khalid Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 97.75 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2019
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement and Development of Infrastructure for Qatif Central Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Qatif, KSA
End User Ministry of Health
Client Qatif Central Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 66.72 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement and Development of Infrastructure for Jubail General Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Jubail, KSA
End User Ministry of Health
Client Jubail General Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 71.99 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Sep, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Replacement Works for King Abdulaziz University Female 200

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 69.42 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Nov, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

  • Handicapping & Landscaping work.
  • Parking area.
  • Asphalt work; 39,000 m².
  • External lighting.
  • Chilled water piping work (6″ to 20“) – 3560 mt.
  • Potable water piping work (50mm to 200mm Dia) – 2365 mt.
  • Sewage water piping work (110mm to 500mm Dia) – 3445 mt.
  • Irrigation system (20mm to 110mm Dia) – 3550 mt.
  • MV cable 400mm² – 14,400 mt.
  • LV cable system.
  • Cable duct bank for MV & LV
  • Compact substation 400 V – 1500 kVA (2 nos) and 1000 kVA (14 nos).
  • Generator 875 kVA (4nos) and 1500 kVA (2nos).
  • Telecommunication system.

P&C for Sea Water Pump Station (201-C01)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant Bechtel
Type of Project Water & Power
Total Value (SAR) 429.33 Million Saudi Riyal
Start Date Dec, 2013
Finish Date Jul, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works. The pumping station shall pump 75.000 m3 / hr sea water to the system network for Ras Al Khair Industrial City when completed.

Scope of Work

Sea Water Cooling Pump Station

  • Vertical Mixed Flow Pump: 4 nos. Capacity 15,000 m³/hr. each (TOTAL 60,000 m³/hr.).
  • Mechanical Bar Screen: 4 nos. Capacity 15,000 m³/hr. Clearing Space between bars 80 mm.
  • Travelling Band Screen: 4 nos. Capacity 15,000 m³/hr. Screening Aperture Size 5×5 mm.
  • FRP/GRP Water Piping including Valves and Fittings: 1,780 m up to 3,300 mm dia.
  • Overhead Crane: 1 no. Lifting Capacity 40 ton.
  • Excavation and Backfilling: 45,000 m³ and 5,000 m³.
  • Concrete: 18,000 m³.

HYPOCHLORITE Generation Building

  • Sodium Hypochlorite Generators: 3 nos. Capacity 540 kVA.
  • Seawater flow through one Generator: 50 m³/hr.
  • Hypochlorite Production: 100 kg/h.
  • Hypochlorite Concentration: 2,000 ppm.
  • Seawater Booster Pump: 2 nos. TDH 1.8 bar Capacity 528 GPM.
  • Automatic Self-Cleaning Filters: 2 nos. Capacity 528 GPM.
  • Sodium Hypochlorite Storage FRP Tank: 2 nos. Capacity 80 m³.
  • SEC 115 kV Power Supply: Including design & engineering works of 115kV cabling system.

Site Development

  • Intake Dredging Works: 200,000 m³ Dredging of intake canal.
  • Shoreline Rip Rap Protection: 9,300 m².
  • Shoreline Interlocking: 1,800 m².
  • Toe-Down to Dredged Channel: 600 m³.
  • Grading: 200,000 m².
  • Surfacing: 5,000 m².
  • Asphalt: 12,000 m²
  • Jelly Fish Basin: Length 100 m, Width 60 m and Depth 2 m.
  • Cofferdam Temporary Works: 60 x 100 m.
  • Staff Control Building
  • Switchgear Building
  • Workshop Building
  • Guard House
  • SEC Building.

Replacement and Development of Infrastructure for King Fahad Hospital

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Health
Client King Fahad Hospital
Project Management Hospital PM
Consultant Specialist Group for Engineering Consultancy
Type of Project Building Renovation
Total Value (SAR) 175.2 Million Saudi Riyal
Start Date Dec, 2013
Finish Date Jun, 2019
Total Land Area
Total Built-up Area 45,000 m2

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.

Technical Services in First & Second Phase of Desalination Plants in Yanbu and Al-Madinah Al-Monawarah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 20.86 Million Saudi Riyal
Start Date Aug, 2013
Finish Date May, 2016
Total Land Area
Total Built-up Area

Work Description

Technical Manpower Supply

Scope of Work

Maintenance technical manpower for Boiler & Desal Phase 1 – 2 and R.O.

Infrastructure in Girls Colleges in Al Rayyan Complex in Dammam

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 349.92 Million Saudi Riyal
Start Date June, 2013
Finish Date Apr, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works, Project is divided to two stages, Package 1 & 2.

Scope of Work

  • Excavation & Backfilling: 115,000 m³ & 52,000 m³
  • Service Tunnel: 5,500 m
  • Chilled Water Piping System: 11,000 m
  • Storm Water Piping System: 4,500 m
  • Sewage Water Piping System: 4,000 m
  • Potable Water Piping System: 9,000 m
  • Domestic Water Piping System: 9,000 m
  • Irrigation Water Piping System: 66,000 m
  • Fire Water Piping System: 10,500 m
  • Data, Voice, CCTV, Public Address, Fire Alarm Networks: 4,200m x 5 = 21,000 m
  • MV Distribution Network: 29,000 m
  • LV Distribution Network: 19,000 m
  • Water Storage Tanks
  • Fire & Domestic Water Tank: 1 no. Capacity 5,304 m³
  • Potable Water Tank: 1 no. Capacity 2,673 m³
  • Irrigation Water Tank: 1 no. Capacity 2,460 m³
  • Raw Water Tank: 1 no. Capacity 550 m³
  • Pump Rooms
  • Domestic Water Pump Room: 3 nos. TDH 6.5 bar, Capacity 555 GPM
  • Fire Water Pump Room: 2 nos. TDH 13 bar, Capacity 1250 GPM
  • Irrigation Water Pump Room: 1 no. TDH 7 bar, Capacity 397 GPM
  • Potable Water Pump Room: 3 nos. TDH 7.5 bar, Capacity 365 GPM
  • Chiller Plant
  • Water Cooled Centrifugal Chiller: 6 nos. Capacity 2,946 TR each (TOTAL 17,676 TR)
  • Closed Circuit Cooling Towers: 5 nos.
  • Chilled & Condenser Water Pumps
  • MV Switchgears
  • Transformers
  • Motor Control Centres

Furnish, Install, Test & Commissioning of Water Cooled Centrifugal Chillers and Vapor Absorption Chillers in AC Station

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dhahran, KSA
End User Ministry of Higher Education
Client King Fahd University of Petroleum and Minerals
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.05 Million Saudi Riyal
Start Date May, 2013
Finish Date Nov, 2014
Total Land Area
Total Built-up Area

Work Description

Mechanical Replacement Works

Scope of Work

  • Supply, Installation and Testing & Commissioning of 4 nos. Water Cooled Centrifugal Chillers 550 TR capacity each (TOTAL 2,200 TR)
  • Supply, Installation and Testing & Commissioning of 1 no. Water Cooled Centrifugal Chiller 750 TR capacity.
  • Supply, Installation and Testing & Commissioning of 2 nos. Fire Absorption Liquid Chillers 200 TR capacity each (TOTAL 400 TR).
  • Supply, Installation and Testing & Commissioning of 2 nos. Fire Absorption Liquid Chillers 250 TR capacity each (TOTAL 500 TR).

Main Chilled Water Piping For Faculty Housing

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 43.87 Million Saudi Riyal
Start Date May, 2013
Finish Date Jan, 2014
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Supply and installation Chilled water pipilines. Pre-insulated pipes. 750, 600, 450, 400, 350, 300 mm diameter pipes total 7950 meter.
  • Supply and installation Packaged ETS Plant; Stainless Steel Double Plate Heat Exchanger, Structural Steel Base, Insulated Double Wall Plant Enclosure, Pumps, Motors and controllers including VFD Drive, Air Separator and Make-Up Water System, Expansion Tank, Chemical Treatment Systems and Chemical Pot Feeder, Valves, Gauges and Piping Accessories, Pipe and Pipe Supports, Pump Vibration Isolation. Electrical Equipments within Packaged ETS plant. DDC Control System with remote workstation Interface Panel. (7 nos. ETS Module. a- 1897Tons (6671.75Kw), b- 2520Tons (8862.84Kw), c- 3010Tons (10586.2Kw), d- 1964Tons (6907.4Kw), e- 2464Tons (8665.89Kw), f- 840Tons (2954.3Kw), g- 1768Tons (6218.1Kw), flanged ends.)