Replacement of the Halon Gas With (NOVEC 1230) Metarials – Phase 2

Project Description

Contractor FEMCO & PAN GULF Consortium
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 34.29 Million Saudi Riyal
Start Date Dec, 2014
Finish Date Jan, 2018
Total Land Area
Total Built-up Area

Work Description

Electro-Mechanical Works

Scope of Work

  • Halon system (SEVO – NOVEC 1230) equipment & piping replacement work including detection & extinguish high system

Design, Supply and Construction Of The Pump Station and The Pipe Connecting the Pump Station To the Existing Pipe Strip Tied – In to RQWTS Operating Tank

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Buraidah, KSA
End User Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Client Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Project Management
Consultant
Type of Project Water & Power
Total Value (SAR) 6.76 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical and Instrument Work

Scope of Work

Pump House

    • Design, Prepare and Excute the Construction Of Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Construction of LV Switchgear Room in side Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Supply and Installation of 2.5 Tons Electric Overhead Crane
    • Supply & Installation of 3 nos of Pump w / Motor; Flow rate: 1000m³/h, Head: 40 mts (4 bar)
    • Supply and Installation of Carbon Steel Pipes, Fittings & Flanges for Suction & Discharge Side of Pumps
    • Supply and Installation of Valves for Suction & Discharge Side of Pumps

Valve Chamber

    • Design, Prepare and Excute the Construction Of Flow Control By-Pass Valve Chamber about 8.1 mts (L) X 4.6 mts(W) X 3.85 mts(H)
    • Supply and Installation of Flow Control, Butterfly Valve and Carbon Steel Pipes & Fittings for Valve Chamber

Modification of Bearing Cooling System for the Main Sea Water Pumps in Pump Station 1 & 2 Al-Jubail

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Client Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Project Management
Consultant
Type of Project Water & Power
Total Value (SAR) 6.76 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical & Instrumentation works

Scope of Work

Engineering Procurement Construction contract for Upgrade & Automation of Bearing cooling system for Main Seawater Pumps.

Completion of Fencing Works from Gate No. (2) to Electrical Substation

Project Description

Contractor FEMCO & Sasel Saudi Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 8.52 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Removing and installation of fence around the university with approximately 900 mt. length and excavation 1000 m3 including all lighting works, CCTV and fire alarm.
  • Removing and installation of gate of university including all civil, electrical and mechanical works

Underpass Construction – Dammam University Infrastructure – Phase 3

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Dammam University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 215 Million Saudi Riyal
Start Date Aug, 2014
Finish Date Sep, 2016
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Excavation & Backfilling: 115,000 m³ & 52,000 m³
  • Total length: 952 m
  • Width: 30 m
  • Second Pile Shoring System
  • Tensile Piles Under Raft
  • Concrete and Road Works

Project of Supplementation of Infrastructure for the University City Third Phase (Lift Station)

Project Description

MEP Contractor FEMCO & Sasel Saudi Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 19.52 Million Saudi Riyal
Start Date Aug, 2014
Finish Date Mar, 2016
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical, Mechanical and Instrument works.

Scope of Work

  • Gravity Pipeline; Catch Basins for GRP. GRP pipes 400, 600, 700, 800, 900, 1000, 1200mm dia. GRP manholes having 1200, 1500mm dia.
  • Lift Station; Excavation support secant piles.Total 1612m2 wall to be constructed.Tension piles underneath the lift station.Ductile Iron Pipe and fittings to be supplied and installation. Submergible pumps with motor and control panel, vapor barrier membrane, Compartment System waterproofing, ceiling mounted weather proof fluorescent lighting fixture, grounding, MV cables.
  • Force Main Pipeline; Supply and laying and install GRP pipe with Air Release Valve.
  • Electrical Room construction for Generator; Construction of Electrical room for Generator and Package substation, Supply and install the Package Substation and one unit of the Generator with storage fuel tank, Underground FRP fuel, Auto Transfer switch, grounding, MCC and ICP.

Supply & Piping on “SA” System to Abha Reservoir at SWTF – Shuqaiq

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shuqaiq, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 2.44 Million Saudi Riyal
Start Date Jun, 2014
Finish Date Jan, 2015
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

  • Excavation and backfilling.
  • Removal of existing 42‘ pipes, fittings & flanges and replace with the new one of 42″, 36″, & 24″ pipes, fittings & filanges.

Upgrading of Medium Voltage Distribution Network (4160) Volt and the Protection System for the Local Generation Station at the Central Services Complex

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 22.26 Million Saudi Riyal
Start Date May, 2014
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Electrical Replacement Works

Scope of Work

  • Generator protection update, Battery charger for Turbine Generators,
  • UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V,
  • Potential Transformer (type Tested) Metal Enclosed,
  • Automatic transfer switch with enclose 600A & 400A, (MCC’s) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters),
  • Single core cable (1×240, 1×95, 1×70, 1×35, 1x16mm2) CU-XLPE/PVC-5K.v, (1×70, 1×35, 1×10 mm2) CU-PVC-600v,
  • Instrumentation cable 16AWG XLP/PVC,
  • Control cables 12 AWG XLP/CPE, Station (start-stop Emergency),
  • Chiller distribution panel 380/220V (DP-3),
  • Motor control center for chiller auxiliary,
  • L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V,
  • Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.

Replacement of Medium Voltage Panels 13.8 kV from Pump Station 1 to Pump Station 4 for Line C and Replacement of the Bus Duct feeding the Panel in Pump Station 1

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail – Riyadh, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 12.95 Million Saudi Riyal
Start Date Apr, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Electrical Works

Scope of Work

  • Removal existing and new installation of MV Panels Pump Station 1 to Pump Station 4.
  • Removal existing and new installation of MV Bus Duct.
  • Termination, testing and commissioning.

Branch Gate No. 3 – Supplementation of Infrastructure – Phase 3

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project Building
Total Value (SAR) 15.69 Million Saudi Riyal
Start Date Marc, 2014
Finish Date Aug, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Works

Scope of Work

The purpose of this Contract is execution of infrastructure works for branch gate no. 3. with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.