Supplementation of Infrastructure for University City (Development of HVAC System)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 27.86 Million Saudi Riyal
Start Date May, 2018
Finish Date Sep, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
  • Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
  • Filtration System: 20 nos. Capacity 54 m³/hr
  • Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
  • Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
  • Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
  • Standby Diesel Generator: 1 nos. 1,500 kVA
  • Transformer, Ring Main Unit, Low Voltage Switchgear, Motor Control Center (MCC) installation, Aboveground & Underground chilled water piping including valves and fittings.

Emergency Technical Services for Phase I & Phase II For SWCC Substation in Yanbu – Al Madinah Al Monawara. (Y-MEG-01-006)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Maintenance
Total Value (SAR) 20.86 Million Saudi Riyal
Start Date Mar, 2018
Finish Date Jan, 2021
Total Land Area
Total Built-up Area

Work Description

  • Desal units, Boilers, RO Plants and Turbines maintenance works under supervision of SWCC

Infrastructure for the Preparatory Year in Faysaliyah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 63.8 Million Saudi Riyal
Start Date Nov, 2017
Finish Date May, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Work Summary: Infrastructure work for the existing and new building in Al Faysaliyah King Abdulaziz University Campus, work including all civil works and complete electro-mecanical work for chiller plant with mechanical and electrical net works as bellow:

  • Water Cooled Centrifugal Chillers: 11 nos. Capacity 560 TR each (TOTAL 6,160 TR)
  • Chilled Water Primary Pumps: 7 nos. TDH 3 bar, Capacity 2,300 GPM
  • Chilled Water Secondary Pumps: 7 nos. TDH 5 bar, Capacity 1,900 GPM
  • Expansion Tanks: 4 nos. Capacity 900 Gallon
  • Heat Exchangers: 11 nos. 1,750 kW
  • Aboveground and Underground Chilled Water Piping: 3,500 m
  • Sewage Piping System: 2,500 m
  • Potable and Fire Water Piping System: 2,500 m
  • Fire Pumps: 2 nos. TDH 6 bar, Capacity 317 GPM
  • Fire Pump: 1 nos. TDH 8 bar, Capacity 1,000 GPM
  • MV Switchgears: 4 nos. 13.8 kV
  • Transformers: 2 nos. 13.8 / 0.4 kV
  • Emergency Generator: 6 nos. 800 kVA

SWCC East & West Coast Maintenance Works

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Maintenance
Total Value (SAR) On Call Basis
Start Date Nov, 2017
Finish Date Sep, 2022
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

  • Firstly: Agreement for inspection and maintenance of water transmission line and Repair Works of Fractures of the Main Transmission Lines.
  • Secondly: Repair Works of Fractures of the Pipelines inside the Main St.
  • Carbon Steel Pipes Ductile Cast Iron Galvanize. Pipe Dia.(200 to 2200 mm)
  • GRP & FRP Pipes. Pipe Dia.(200 to 2200 mm)
  • PCCP & CCP Pipes. Pipe Dia. (200 to 800 mm)

Completion of Infrastructure for Housing of University City (Generators & Synchronization Panel)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 36.86 Million Saudi Riyal
Start Date Oct, 2017
Finish Date Dec, 2018
Total Land Area
Total Built-up Area

Work Description

Civil & Electrical Work

Scope of Work

Generator Plant

  • MV Generators with Battery Charger: 9 nos. Capacity 3,500 kVA, 13,8 kV
  • Synchronization Panel of MV Generators: 1 nos. Capacity 17.5 KV, 1250 A, 25KA/3SEC
  • Hoisting Cranes: 2 nos. Lifting Capacity 15 ton
  • Data, Telephone IP System and CCTV System
  • BMS
  • Firefighting & Fire Alarm System

District Cooling For Community Area Package 1 – Pipeline Distribution Network

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 43.98 Million Saudi Riyal
Start Date Oct, 2017
Finish Date Jan, 2021
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Engineering, procurement and construction (EPC).
  • Chilled Water Piping System including valve chambers: 6,000 m.
  • Fibber Optic Cable: 1,500 m.
  • Excavation and Backfilling..

Pipeline for Saline Water Conversion Corporation (SWCC) tank to Royal Commission Tank

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant
Type of Project Water & Power
Total Value (SAR) 18.94 Million Saudi Riyal
Start Date Jun, 2017
Finish Date Jan, 2018
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

SWCC POTABLE PIPELINE

  • Addition scope was added to project 201-C01 as of Supply, Installation and testing of GRP pressure 1200 mm, 4.8 km from Saline Water Conversion Corporation (SWCC) tank to Royal Commission tank, including all required earth work

Project of Technology Transfer and Water Purchase Production by SWCC Through Construction of MED-TVC Unit in Shuaiba 2 Desalination Plant

Project Description

Main Contractor ACWA Power SASAKURA (APS)
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shuaiba, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 42 Million Saudi Riyal
Start Date Mar, 2017
Finish Date Nov, 2018
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical, Mechanical & Instrumentation Work

Scope of Work

  • The complete package / built-up MED Evaporator Unit (91,200 m³ /day).
  • Package CVL – 02 Civil Works; earthworks, foundations, road works,
  • Construction of Electrical Control & Switchgear Building and Discharge pit etc.
  • Package EMP – 01 Electromechanical erection works, with limited supply items such as insulation for piping materials, support materials etc.

Infrastructure Works for Projects of King Abdulaziz University Northern Area – Wadi Jeddah

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Wadi Jeddah
Client Wadi Jeddah
Project Management Fluor Consultants
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 291.39 Million Saudi Riyal
Start Date May, 2016
Finish Date May, 2018
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical and Instrument Work.

Scope of Work

  • Water Cooled Centrifugal Chillers: 12 nos. Capacity 2,185 TR each (TOTAL 26,220 TR)
  • Fluid Coolers draft type with dual axial fans and coils: 60 nos. fans total and 4.88 m dia.
  • Chilled Water Pumps: 12 nos. TDH 2 bar, Capacity 4,548 GPM
  • Condenser Water Pumps: 12 nos. TDH 3.5 bar, Capacity 7,147 GPM
  • Distribution Pumps: 6 nos. TDH 7 bar, Capacity 10,700 GPM
  • Isolating Valves: 422 nos. up to 1,050 mm dia.
  • Chilled Water Piping: 6,000 m total
  • Transformers Dry Type: 6 nos. Capacity 13.8 / 0.38 kV
  • Motor Control Centers (MCC)
  • Area Lighting
  • Panel Boards
  • Grounding and Lightning Protection

Supply, Fabrication & Installation of Chilled Water Pipelines With Insulation at Shuqaiq Plant

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shuqaiq, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 1.16 Million Saudi Riyal
Start Date May, 2015
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Mechanical works

Scope of Work

  • Supply & Fabricate the Chilled Water Pipelines.
  • It is the actual Routing & Installation of Chilled Water Lines.
  • Insulating them at site with Proper Supports and Tie-in to the existing system.
  • Providing temporary cooling arrangements to individual rooms and in M.C.R