Removal of Cement Mortar Lining Debris in Line (B) between PS1 & PS2 of Riyadh Water Transmission System

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 6.9 Million Saudi Riyal
Start Date 20 Jan, 2021
Finish Date 28 Jan, 2021
Total Land Area
Total Built-up Area

Work Description

  • Removal of Cement Mortar Lining Debris in Line (B) between PS1 & PS2 of Riyadh Water Transmission System, within 9 days, 24-hour duty, consisting of Excavation & Wrapping Removal, Draining, Cutting, Cleaning, Fit-up and Welding & NDT.

P&C of Sea Water Cooling Supply Piping for Royal Commission at Ras Al-Khair

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management
Consultant Bechtel
Type of Project Pipeline
Total Value (SAR) 30.19 Million Saudi Riyal
Start Date May, 2020 (Notice to Proceed)
Finish Date May, 2021
Total Land Area
Total Built-up Area

Work Description

Infrastructure Pipeline

Scope of Work

  • Installation and Testing & Commissioning of 6,000 LM pf 1600 mm dia pipe

Interior Fit‐Out and Furnishing of Currie & Brown Office, Riyadh

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Currie & Brown
Client Currie & Brown
Project Management IDS Development Management and Consultancy
Consultant IDS Development Management and Consultancy
Type of Project Office Building
Total Value (SAR) 0.75 Million Saudi Riyal
Start Date Jan, 2020
Finish Date Oct, 2020
Total Land Area
Total Built-up Area 650 m2

Work Description

Interior Design and Electrical & Mechanical Works

Scope of Work

  • Supply and Construction of Glass Partitions
  • Supply and Construction of Gypsum Wall Partitions & Ceiling Works
  • Rehabilitation and Improvement of HVAC System
  • Rehabilitation and Improvement of Fire Sprinkler & Fire Alarm System
  • Rehabilitation and Improvement of IP Data System
  • Rehabilitation and Improvement of CCTV System
  • Rehabilitation and Improvement of Access Control System
  • Rehabilitation and Improvement of Power Distribution System
  • Supply and Assembly of All Office Furnitures

Replacement D31-K-0523A Blower Project @ Shedgum Gas Plant, Saudi Aramco

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shedgum, KSA
End User Saudi Aramco
Client Saudi Aramco
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 1.9 Million Saudi Riyal
Start Date Dec, 2019
Finish Date Oct, 2020
Total Land Area
Total Built-up Area

Work Description

  • To replace the existing D31-K-0523A Blower with all required expansion bellows & isolation requirements

Design, Construction and Fit-Out of the DGDA Site Offices

Project Description

Contractor FEMCO & SASEL CONSORTIUM
Location Riyadh, KSA
End User Diriyah Gate Development Authority (DGDA)
Client Diriyah Gate Development Authority (DGDA)
Project Management Faithful+Gould
Consultant Khatib & Alami
Type of Project Office Building
Total Value (SAR) 89 Million Saudi Riyal
Start Date Jul, 2019
Finish Date Jun, 2020
Total Land Area 45,000 m2
Total Built-up Area 12,000 m2

Work Description

Infrastructure and Electrical & Mechanical Works

Scope of Work

  • 45,000 m2 Asphalt and 37,000 m2 Parking Area
  • Underground Storm, Sewage, Potable, Irrigation and Fire Water Network
  • Construction of 2-floors Total 12,000 m2 Steel Structure Office Building
  • Construction and Furnishing of 1 No. Main Guard House
  • Supply and Assembly of All Office Furnitures
  • All associated Civil, Architectural and Electro-Mechanical Works

Chilled Water Line – SWCC

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 5.18 Million Saudi Riyal
Start Date May, 2019
Finish Date Feb, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical Work

Scope of Work

  • Supply and Installation New GRV Pipes & Fittings
  • Supply and Installation of Power Pack for DN 900 Butterfly valves
  • Fabrication of GRP Pipe supports.
  • Civil Works; Concrete Work for Pipes Foundation, Asphalt Cutting, Excavation  and Back filling work

Infrastructure of University City (Phase 3) Rehabilitation of Cooling Towers

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.25 Million Saudi Riyal
Start Date Apr, 2019
Finish Date Apr, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
  • Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
  • Filtration System: 20 nos. Capacity 54 m³/hr
  • Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
  • Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
  • Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
  • Standby Diesel Generator: 1 no. 1,500 kVA

Mechanical Works for Steam Boilers Network in Medical Center

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 8.1 Million Saudi Riyal
Start Date Nov, 2018
Finish Date Nov, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Renovation of Boiler Building Replacement of doors and windows,
  • Plastering, painting, ceiling and roof insulation system works.
  • Replacement of (3) nos. Diesel type Steam Boiler
  • Supply, installation, testing & Commissioning of (2) nos. Electric type Steam Boilers and (1) no. Gas type Steam Boiler with steam capacity 1.5 ton/hr.
  • Rehabilitation of (2) nos. Steam Pumps.
  • Supply, installation, Testing & Commissioning of AHU & ducting,
  • RO Unit, Water Softener Unit, Pumps, pipe & fittings and valves,
  • Boiler Plant Fire Fighting System,
  • BMS, Main Distribution Board, cable and cable trays.
  • Underground existing High Pressure Steam Line Test (X-RAY and REPLICA)

Construction of Infrastructure for University City – Central Air Chillers (Phase 1)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 26.08 Million Saudi Riyal
Start Date Nov, 2018
Finish Date May, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Air Cooled Chillers: 8 nos. Capacity 500 TR each (TOTAL 4,000 TR)
  • Chilled Water Pumps: 10 nos. TDH 6.25 bar, Capacity 1,200 GPM
  • Chilled Water Piping System: 350 m, DN800, RTR/GRE, Underground
  • Expansion Tank & Air Separator
  • Split Units and Exhaust Fans
  • FM200 Firefighting System
  • Building Management Control System
  • Fire Alarm System
  • Grounding and Lightning System

KFU Projects for Parking Lots for Female Employees and Students

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project Parking & Landscaping
Total Value (SAR) 5.25 Million Saudi Riyal
Start Date Sep, 2018
Finish Date Jan, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works

Scope of Work

  • King Faisal University for parking lots for female employees and students.
  • 31000 M2 Area excavation, backfilling, base-coarse and asphalt.
  • All parking area marking, lighting and water drainage system.
  • Parking Gate building all civil, electrical and mechanical work.