Project Description
MEP Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Jeddah, KSA |
End User | Wadi Jeddah |
Client | Wadi Jeddah |
Project Management | Fluor Consultants |
Consultant | Fluor Consultants |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 291.39 Million Saudi Riyal |
Start Date | May, 2016 |
Finish Date | May, 2018 |
Total Land Area | |
Total Built-up Area |
Work Description
Civil, Mechanical, Electrical and Instrument Work.
Scope of Work
- Water Cooled Centrifugal Chillers: 12 nos. Capacity 2,185 TR each (TOTAL 26,220 TR)
- Fluid Coolers draft type with dual axial fans and coils: 60 nos. fans total and 4.88 m dia.
- Chilled Water Pumps: 12 nos. TDH 2 bar, Capacity 4,548 GPM
- Condenser Water Pumps: 12 nos. TDH 3.5 bar, Capacity 7,147 GPM
- Distribution Pumps: 6 nos. TDH 7 bar, Capacity 10,700 GPM
- Isolating Valves: 422 nos. up to 1,050 mm dia.
- Chilled Water Piping: 6,000 m total
- Transformers Dry Type: 6 nos. Capacity 13.8 / 0.38 kV
- Motor Control Centers (MCC)
- Area Lighting
- Panel Boards
- Grounding and Lightning Protection