Project Description
Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Al Ahsa, KSA |
End User | Ministry of Higher Education |
Client | King Faisal University |
Project Management | KFU-PM |
Consultant | Al-Saif Consultants |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 245.21 Million Saudi Riyal |
Start Date | Mar, 2015 |
Finish Date | June, 2021 |
Total Land Area | 1,000,000 m2 |
Total Built-up Area | – |
Work Description
Civil, Electrical & Mechanical works
Scope of Work
Site Infrastructure
- Excavation: 250,000 m³
- Backfilling: 450,000 m³
- Concrete Works: 10,000 m³
- Precast Fence Wall: 3,000 m
- Asphalt: 150,000 m²
- Chilled Water Piping System: 1,000 m
- Steam and Condensate Water Piping System: 2,000 m
- Sewerage Piping System: 4,500 m
- Potable Water Piping System: 5,000 m
- Raw Water Piping System: 5,000 m
- Fire Water Piping System: 4,000 m
- Storm Water Piping System: 2,000 m
- Irrigation Water Piping System: 6,000 m
- Deep Well: 4 nos. 250 m
- Deep Well Water Piping System: 1,000 m
- Manholes: 110 nos. FRP
- Water Steel Storage Tanks: 6 nos. Capacities 3,000 m³ each
- LV, MV and Communication Ductbank: 13,000 m
- Cabling: 33,000 m
- Transformers and Substations: 26 nos up to 2,000 kVA
- External Area Lightning: 950 nos.
- Reverse Osmosis (RO) Plant: 750 m³/day
Generator Plant
- Diesel Generators: 11 nos. 2,500 kVA
- Underground Diesel Tanks: 3 nos. Capacity 40,000 Gallon
Chiller Plant
- Water Cooled Centrifugal Chiller: 2 nos. Capacity 2,151 TR each (TOTAL 4,302 TR)
- Air Cooler Radiators: 16 nos. 269 TR
- Lift Stations: 13 Nos., capacity of 8-12 m depth
- Steam Calorifiers: 10 nos., 1600-5400 L
- Heat Exchanges: 11 nos., 1675 kW & 1805 kW
- Condensate Recovery Unit: 2 nos., 200 L each