Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Riyadh, KSA
End User Ministry of Higher Education
Client King Saud University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 22.26 Million Saudi Riyal
Start Date May, 2014
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Electrical Replacement Works

Scope of Work

  • Generator protection update, Battery charger for Turbine Generators,
  • UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V,
  • Potential Transformer (type Tested) Metal Enclosed,
  • Automatic transfer switch with enclose 600A & 400A, (MCC’s) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters),
  • Single core cable (1×240, 1×95, 1×70, 1×35, 1x16mm2) CU-XLPE/PVC-5K.v, (1×70, 1×35, 1×10 mm2) CU-PVC-600v,
  • Instrumentation cable 16AWG XLP/PVC,
  • Control cables 12 AWG XLP/CPE, Station (start-stop Emergency),
  • Chiller distribution panel 380/220V (DP-3),
  • Motor control center for chiller auxiliary,
  • L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V,
  • Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.