Project Description
MEP Contractor | Faisal Electro-Mechanical Co. Ltd. |
Location | Al Ahsa, KSA |
End User | Ministry of Higher Education |
Client | King Faisal University |
Project Management | University PM |
Consultant | Zuhair Fayez Partnership (ZFP) |
Type of Project | District Cooling & Infrastructure |
Total Value (SAR) | 290.8 Million Saudi Riyal |
Start Date | Jun, 2010 |
Finish Date | Jun, 2013 |
Total Land Area | 500,000 m2 |
Total Built-up Area |
Work Description
Civil, Mechanical, & Electrical Infrastructure & Utilities Works
Scope of Work
Site Development
-
- Excavation & Backfilling: 263,000 m³ & 220,000 m³
- Concrete Works: 8,000 m³
- Asphalt Works: 52,000 m²
- Curbstone: 10,000 m²
- Chilled Water Piping System: 4,500 m
- Storm Water Piping System: 800 m
- Sewage Water Piping System: 2,200 m
- Potable Water Piping System: 2,200 m
- Raw Water Piping System: 2,800 m
- Well Water Piping System: 500 m for 3 nos. deep well
- Reverse Osmosis (RO) Unit: 2 nos. Capacity 750 m³/day
- Break Water Tank: 1 nos. Capacity 500 m³
Chiller Plant
-
- Water Cooled Centrifugal Chillers: 6 nos. Capacity 2,151 TR each (TOTAL 12,906 TR)
- Air Cooler Radiators: 44 nos. Capacity 269 TR each (TOTAL 11,836 TR)
- Primary Chilled Pumps: 8 nos. TDH 2.6 bar, Capacity 3,250 GPM
- Condenser Water Pumps: 8 nos. TDH 3.7 bar, Capacity 7,300 GPM
- Secondary Chilled Pumps: 5 nos. TDH 6 bar, Capacity 5,700 GPM
- Boilers: 4 nos. Capacity 7,710 kg/hr
Generator Plant
-
- Generators: 5 nos. Capacity 2500kVA each
- MV Switchgear: 1 no. 13.8 kV, 2500 kVA
Pump Rooms
-
- Raw Water Pump: 4 nos. TDH 9.5 bar, Capacity 161 GPM
- Irrigation Water Pump: 3 nos. TDH 6.5 bar, Capacity 250 GPM
- Fire Pump: 2 nos. TDH 13.5 bar, Capacity 47 GPM