Completed Projects

« Previous   Next »

  • Project Name: Refurbishment Works of Jeddah Phase 4 - Desal. Plant (Contr:Nos. 8/1/1/260 & 261)
  • Location: Jeddah / K.S.A.
  • Contractor: ACWA Power SASAKURA (APS) (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
  • Client: Saline Water Conversion Corporation (SWCC)
  • Type of Project: Water & Power
  • Value (SR): 40.5 Millions
  • Start Date: Sep. 2004
  • Finish Date: Apr. 2007
  • Work Description:
    Rehabilitation Works of Evaporator Tube Bundles and modification of Vacuum System
  • The Scope of Work:
    • Removal and Replacement of Brine Pipes, Sea Water Pipes, Water boxes, Demisters & Manhole Covers.
    • Tube Bundles Demolishing & Replacement.
    • Removal and Replacement of: Vent Pipes, Tube Sheets Necks, Tube Support Plates and Intermediate Tube Sheets.
    • Insertion & Expanding of 53,200 nos. of 90/10 Cu.Ni. Tubes (O.D 19 mm x 25000 mm length.) with subsequent
      Leakage Test using Pressure Air.
    • Cleaning, Rust Removal, Sandblasting, & Coating Works.
    • Lining Works ( mounting SS lining material on evaporated internal surface above Demister for Corrosion Protection
      after cleaning )
    • Modification of Evaporator Venting & Vacuum System, Brine Gate Cover and inspection of Brine Heater Tubes.
    • Replacement of Pump Suction & Discharge Valves and Leakage Test.
    • All related Elect. & Instrumentation Works.