WATER & POWER

Completed Projects

« Previous   Next »

  • Project Name: Design, Supply and Construction Of The Pump Station and The Pipe Connecting the Pump Station To the Existing Pipe Strip Tied - In to RQWTS Operating Tank
  • Location: Qassim, Buraydah / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Saline Water Conversion Corporation (SWCC)
  • Type of Project: Water & Power
  • Value (SR): 12.84 Millions
  • Start Date: Sep. 2014
  • Finish Date: Nov. 2015
  • Work Description:
    Civil, Mechanical, Electrical and Instrument Work
  • The Scope of Work:
  •    Pump House
    • Design, Prepare and Excute the Construction Of Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Construction of LV Switchgear Room in side Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Supply and Installation of 2.5 Tons Electric Overhead Crane
    • Supply & Installation of 3 nos of Pump w / Motor; Flow rate: 1000m³/h, Head: 40 mts (4 bar)
    • Supply and Installation of Carbon Steel Pipes, Fittings & Flanges for Suction & Discharge Side of Pumps
    • Supply and Installation of Valves for Suction & Discharge Side of Pumps
  •    Valve Chamber
    • Design, Prepare and Excute the Construction Of Flow Control By-Pass Valve Chamber about 8.1 mts (L) X 4.6 mts(W) X 3.85 mts(H)
    • Supply and Installation of Flow Control, Butterfly Valve and Carbon Steel Pipes & Fittings for Valve Chamber