We have implemented and performed several prestigious and unique challenges into the construction & infrastructure projects in all over the Kingdom of Saudi Arabia, that remarkably emphasize the strengthen of our services capabilities through optimum utilization of available resources. It is essential that we consistently meet or exceed our customer's expectations for Quality, Performance, Timeliness, and Cost efficiency. FEMCO provides developed wide range of advanced construction services in Commercial, Industrial, & Infrastructure sectors in the field of electro-mechanical & instrumentation activities and relevant construction works for Buildings, Industrial Plants, Energy, and Facilities. FEMCO likewise are specializing in the field of Building Steel Structure, Fabrication & Erection of supports, Platforms, Insulations etc. Here you can read more about the projects we are currently involved in or look through our project lists.

 
 

Infrastructure of University City (Phase 3) Rehabilitation of Cooling Towers

Location: Dammam / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Imam Abdulrahman Bin Faisal Universit
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 9.25 Millions
    • Start Date: Apr. 2019
    • Finish Date: Apr. 2020

    Work Description: 
    Electrical & Mechanical works

    The Scope of Work:
    • Rehabilitation works of Cooling Tower (16 Sets) each set capacity 3900 gpm. Supply , Installation , Testing & Commissioning of Cooling Tower motor with gear box, Cooling Tower Fan, Motorized Butterfly valves and Gate valves, Cooling Fills, Drift Eliminators, Spraying Nozzles, Chemical Dosing System and Control Panels for Cooling Towers.

     
     

    Mechanical Works for Steam Boilers Network in Medical Center

    • Location: Jeddah / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Abdulaziz University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 8.1 Millions
    • Start Date: Nov. 2018
    • Finish Date: Nov. 2020

    Work Description: 
    Civil, Mechanical & Electrical Work

    The Scope of Work:
    • 1- Renovation of Boiler Building Replacement of doors and windows, plastering, painting, ceiling and roof insulation system works.
      2- Replacement of three (3) nos. Diesel type Steam Boiler. Supply, installation, testing & Commissioning of two (2) nos. Electric type steam boilers and one (1) no. Gas type Steam Boiler with steam capacity 1.5 ton/hr.
      3- Rehabilitation of two (2) nos. steam pumps.
      4- Supply, installation, Testing & Commissioning of AHU & ducting, RO Unit, Water Softener Unit, Pumps, pipe & fittings and valves, Boiler Plant Fire Fighting System, BMS, Main Distribution Board, cable and cable trays.
      5- Underground existing High Pressure Steam Line Test (X-RAY and REPLICA)




     
     

    Construction of Infrastructure for University City- Central Air Chillers (Phase 1)

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Imam Abdulrahman Bin Faisal Universit
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 26.08 Millions
    • Start Date: Nov. 2018
    • Finish Date: May. 2020

    Work Description: 
    Civil, Mechanical & Electrical Work

    The Scope of Work:
    • A - Site Construction- Construction of Building for Electrical Equipment, Construction of Boundary Walls, Constriction of Interlock, Curbstones, Parking areas and Road works. Infrastructure works for Chilled Water System, storm, Sewage, Irrigation and water networks system including valve chambers and Equipment Foundations.

      B - Supply , Installation , Testing & Commissioning of Electro-Mechanical works such as Air Cooled Chillers 8 nos. each one 500 Ton capacity , Chilled water Pumps , Hydronic Piping in Chiller Plant including Valves & other accessories ,Chemical Treatment System, HVAC works , Fire Fighting works , Power outlet works , Transformer , Ring Main Unit (RMU) , Motor Control Center (MCC) , MDB, Data and Telephone System, IP CCTV System, Low Voltage & Medium Voltage Cables works and BMS System.

     
     

    KFU projects for parking lots for female empolyees and students

    • Location: Al-Ahsa / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 5.25Millions
    • Start Date: Sep. 2018
    • Finish Date: June. 2019

    Work Description: 
    Civil, Mechanical & Electrical Replacement Works

    The Scope of Work:
    • King Faisal University for parking lots for female employees and students.
      31000 M2 Area excavation, backfilling, basecouse and asphalt.
      All parking area marking, lighting and water dranege system.
      Parking Gate building all civil, electrical and mechanical work.
     
     

    Supplementation of Infrastructure for University City (Development of HVAC system)

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Imam Abdulrahman Bin Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 27.86 Millions
    • Start Date: May. 2018
    • Finish Date: Sep. 2020

    Work Description:
    Civil, Electrical & Mechanical Work

    The Scope of Work :
    Site Construction- Infrastructure works for Chilled Water & Condenser water networks including valve chambers and Concrete Basins for Cooling Towers.
    Supply , Installation , Testing & Commissioning of Electro-Mechanical works such as Centrifugal water Chillers 3 nos. each one 1300 Ton , Cooling Towers 4 nos. each one 3900 gpm , Filtration system for Cooling Towers including circulation Pumps , Electrolytic Bromine units , Chilled water Pumps , Condenser water Pumps , Hydronic Piping in Chiller Plant including Valves & other accessories , HVAC works , Fire Fighting works , Power outlet works , Transformer , Ring Main Unit (RMU) , Low Voltage Switchgear , Motor Control Center (MCC) , Generator 1500 KVA , Low Voltage & Medium Voltage Cables works and BMS System.
     
     

    P&C Of District Cooling Plant in Community Area (097-C78)

    • Location: Jubail / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Royal Commission for Jubail and Yanbu
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 159.73 Millions
    • Start Date: Jan. 2018
    • Finish Date: Aug. 2020


    • Work Description:
      • Civil, Electrical & Mechanical Work

    The Scope of Work

    • The scope of work in this contract includes the following element:
        • A - Site Development
          • • Site Preparation, earthworks and ground improvement
          • • Roads
          • • Storm Water Drainage System
          • • Potable and Fire Water System
          • • Sanitary Waste Water Collection System
          • • Reject Water System
          • • Treated Sewage Effluent Distribution System
          • • Storage Steel Tanks
          • • Electrical Distribution System
          • • Area Lighting
          • • Telecommunication, Control & Instrumentation
          • • Landscaping Works
        • B - Buildings
          • • CHW (Cooling) Plant Building
          • • TSE-TTP (Tertiary Treatment Plant) Building
          • • Pump Station Building
          • • MV Switchgear Building
          • • Guard Houses
     
     

    Project of Infrastructure for the Preparatory Year in Faysaliyah

    • Location: Jeddah / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Abdulaziz University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 63.8 Millions
    • Start Date: Nov. 2017
    • Finish Date: Dec . 2019


  • Work Description:
    • Civil, Electrical & Mechanical Work

  • The Scope of Work
      • Work Summary : infrastructure work for the existing and new building in Al faysalieh King Abdul Aziz campus, work including all civil works and complete electromecanical work for chiller plant with mechanical and electrical net works as bellow :
        • • Construction of the Chiller plant Building & Pumps Building
          • • Supply and Installation; Chiller (560 tone/each) (11 no), Primary and secondary pumps (7 no each), heat exchanger (12 no), Above and under ground child water pipes with required valve chambers, Pipes for potable and fire fighting networks with required valve chambers, Pipes and manholes for sewage system, medium voltage cables netwaork, Low voltage cables net work, Medium voltage switch gear (4 no), Oil type transformer (8 no), Main distribution panels for chillers (11 no), Ring main unit (21 no), MCC panels, Generators (6 no), Automatic transfer switch (ATS) (6 no), Fuel tanks, Building management system (BMS) for the complete system.
          • • Testing and Conissioning for the complete system.
  •  
     

    District Cooling For Community Area Package 1 – Pipeline Distribution Network (Contract # PIC F-8147)

    • Location: Yanbu / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Royal Commission for Jubail and Yanbu
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 43.98 Millions
    • Start Date: Oct. 2017
    • Finish Date:Oct. 2019


    • Work Description:
    • Civil, Electrical & Mechanical Work


  • The Scope of Work
      • Work of this contract includes engineering, procurement and construction (EPC) and all work necessary for the District Cooling for the Community Area Chilled Water Piping Network and the installation of a fiber optic control network to each land parcel.
        • • Design, Supply, installation Testing & Commissioning of chilled water system pipework & valves Phase 1
        • • Supply & installation of fiber optic cable
        • • Work include civil work excavation, backfilling, valve chambers & concrete works.
  •  
     

    KFU Teaching Hospital Project in Al-Ahsa, Phase-2

    • Location: Al-Ahsa / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. - Yuksel Insaat Saudia Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 245.21 Millions
    • Start Date: Mar. 2015
    • Finish Date: Jun. 2020


    • Work Description:
    • Civil, Mechanical, & Electrical Infrastructure & Utilities Works


    • The Scope of Work
    • Site Leveling: 210,000 m3 of Excavation, 450,000 m3 of Backfilling, 8,000 m3 of Concrete Works and 140,000 m2 of Asphalt Cover Area; 38,000 m of Curbstone.
    • All Civil & Electro-Mechanical Works for: Supply & Installation of 2 nos. Chiller Plants of 2,150 TR capacities, 16 nos. Air cooler Radiators 946 kW (269 Tons); Chilled Water and Condenser Pumps, MV Switchgear & Accessories.
    • All Civil & Electro-Mechanical Works for: Supply & Installation of Sewage Treatment Systems (STP), 2 no. of IBAC Tank, 750 m3/day cap. Reverse Osmosis Unit (R.O), and Generator Building with 11 nos. Stand-by 2500 kVA capacity Generators, Underground Diesel Tanks and 3 nos. Main Gates complete all Accessories and equipment




     