  • Project Name: Supplementation of Infrastructure for University City (Development of HVAC system)
  • Location: Dammam / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Imam Abdulrahman Bin Faisal University
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 27.86 Millions
  • Start Date: May. 2018
  • Finish Date: Sep. 2020
  • Work Description:
    • Civil, Electrical & Mechanical Work
  • The Scope of Work
      • • Site Construction- Infrastructure works for Chilled Water & Condenser water networks including valve chambers and Concrete Basins for Cooling Towers.

      • Supply , Installation , Testing & Commissioning of Electro-Mechanical works such as Centrifugal water Chillers 3 nos. each one 1300 Ton , Cooling Towers 4 nos. each one 3900 gpm , Filtration system for Cooling Towers including circulation Pumps , Electrolytic Bromine units , Chilled water Pumps , Condenser water Pumps , Hydronic Piping in Chiller Plant including Valves & other accessories , HVAC works , Fire Fighting works , Power outlet works , Transformer , Ring Main Unit (RMU) , Low Voltage Switchgear , Motor Control Center (MCC) , Generator 1500 KVA , Low Voltage & Medium Voltage Cables works and BMS System.