  • Project Name: Wadi Jeddah “Infrastructure Works for Projects of King Abdulaziz University Northern Area
  • Location: Jeddah / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Wadi Jeddah
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 291.39 Millions
  • Start Date: May 2016
  • Finish Date: May 2018
  • Work Description:
    • Civil, Mechanical, Electrical and Instrument Work.
  • The Scope of Work
  • • Civil works :  Additional Fluid Cooler Building
  • • Supply & Installation of total 12 number Chillers capacity of 2180 RTon/each
  • • Supply & Installation of 30 number Fluid Coolers (60 number fans(16feet/4.88meter dia/each)
  • • Supply & Installation & Modification of total 30 Pumps (Condenser Water Pumps, Chiller Pumps and Distribution Pumps)
  • • Supply & Installation of Valves size 1050mm. dia and below ( Isolation, Flow Control, Triple Duty etc)
  • • Supply & Installation of Pre-insulated Carbon Steel Pipes & Fittings size 1350mm. dia and below (Chilled Water Pipes – Aboveground)
  • • Supply & Installation of Pre-insulated RTR Pipes & Fittings size 750mm. dia and below (Chilled Water Lines Underground)
  • • Supply & installation of 6 numbers 13.8/0.38 KV Dry type Transformers, (capacity 1500/2250 KVA & 2000/3000 KVA)
  • • Supply & installation of MV & LV Cables
  • • Supply & installation Building Management System (BMS)
  • • Supply & installation 6 nos. Motor Control Center including all motor,starters, relays etc.
  • • Supply & installation All electrical works (lighting, power, panel boards, .grounding & lightning protection)