  • Project Name: Upgrading of Medium Voltage Distribution Network (4160) Volt and the Protection System for the Local Generation Station at the Central Services Complex
  • Location: Riyadh / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: King Saud University
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 22.26 Millions
  • Start Date: May. 2014
  • Finish Date: Feb. 2016
  • Work Description:
    Electrical Replcaement Works
  • The Scope of Work:
    • Generator protection update, Battery charger for Turbine Generators, UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V, Potential Transformer (type Tested) Metal Enclosed, Automatic transfer switch with enclose 600A & 400A, (MCC's) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters), Single core cable (1x240, 1x95, 1x70, 1x35, 1x16mm2) CU-XLPE/PVC-5K.v, (1x70, 1x35, 1x10 mm2) CU-PVC-600v, Instrumentation cable 16AWG XLP/PVC, Control cables 12 AWG XLP/CPE, Station (start-stop Emergency), Chiller distribution panel 380/220V (DP-3), Motor control center for chiller auxiliary, L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V, Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.