  • Project Name: Project of Supplementation of Infrastructure for the University City Third Phase (Lift Station)
  • Location: Dammam / K.S.A.
  • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Sasel Saudi L.L.C
  • Client: University of Dammam
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 19.52 Millions
  • Start Date: Aug. 2014
  • Finish Date: Mar. 2016
  • Work Description:
    Civil, Electrical, Mechanical and Instrument works.
  • The Scope of Work:
    • Gravity Pipeline; Catch Basins for GRP. GRP pipes 400, 600, 700, 800, 900, 1000, 1200mm dia. GRP manholes having 1200, 1500mm dia.
    • Lift Station; Excavation support secant piles. Total 1612m2 wall to be constructed. Tension piles underneath the lift station. Ductile Iron Pipe and fittings to be supplied and installation. Submergible pumps with motor and control panel, vapor barrier membrane, Compartment System waterproofing, ceiling mounted weather proof fluorescent lighting fixture, grounding, MV cables.
    • Force Main Pipeline; Supply and laying and install GRP pipe with Air Release Valve.
    • Electrical Room construction for Generator; Construction of Electrical room for Generator and Package substation, Supply and install the Package Substation and one unit of the Generator with storage fuel tank, Underground FRP fuel, Auto Transfer switch, grounding, MCC and ICP.