DISTRICT COOLING & INFRASTRUCTURE

Completed Projects

« Previous   Next »

  • Project Name: Main Chilled Water Piping For Faculty Housing
  • Location: Jeddah / K.S.A.
  • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. - Yuksel Insaat Saudia Co. Ltd.
  • Client: King Abdulaziz University
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 43.87 Millions
  • Start Date: May. 2013
  • Finish Date: Jan. 2014
  • The Scope of Work:
    • Supply and installation Chilled water pipilines. Pre-insulated pipes. 750, 600, 450, 400, 350, 300 mm diameter pipes total 7950 meter.
    • Supply and installation Packaged ETS Plant; Stainless Steel Double Plate Heat Exchanger, Structural Steel Base, Insulated Double Wall Plant Enclosure, Pumps, Motors and controllers including VFD Drive, Air Separator and Make-Up Water System, Expansion Tank, Chemical Treatment Systems and Chemical Pot Feeder, Valves, Gauges and Piping Accessories, Pipe and Pipe Supports, Pump Vibration Isolation. Electrical Equipments within Packaged ETS plant. DDC Control System with remote workstation Interface Panel. (7 nos. ETS Module. a- 1897Tons (6671.75Kw), b- 2520Tons (8862.84Kw), c- 3010Tons (10586.2Kw), d- 1964Tons (6907.4Kw), e- 2464Tons (8665.89Kw), f- 840Tons (2954.3Kw), g- 1768Tons (6218.1Kw), flanged ends.)