  • Project Name: Preparation of Infrastructure for the University City in Al-Ahsa, Phase-4,(King Faisal University Permanent Campus in Al-Ahsa)
  • Location: Al-Ahsa / K.S.A.
  • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
  • Client: King Faisal University
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 143.07 Millions
  • Start Date: Mar. 2011
  • Finish Date: Jun. 2013
  • Work Description:
    The Infrastructure Phase-4 Stage–1 A project is located along the Academic Area, East Loop Road, West Loop Road, Road-A, Male's Dormitory Area, and Female's Dormitory Area of King Faisal University Campus, Al – Ahsa.
  • The Scope of Work:
    • Providing full operation preventive maintenance and overall maintenance for electro-mechanical network systems for campus & around 15 campus buildings.
    • Building Works including Civil, Electrical & Mechanical Works.
    • Utilities Works
    • Chiller Building Electro-Mechanical Maintenance Works.
    • Generator Building including Civil & Electro-Mechanical Works.
    • Roads & Street Improvement Works (285.000 m2 asphalt)
    • Landscape & Hardscape Works (90.000 m2 planting area)
    • Bridge, Spine Wall & Retaining Wall Works.
    • Underground Utilities such as:
      1. Sanitary Sewer System (3.300 mt)
      2. Storm Water Drainage System (6.500 mt)
      3. Raw Water System (4.800 mt)
      4. Sweet Water System (2.600 mt)
      5. Well Water System (4 ea deep wells)
      6. Chilled Water System (800 mt)
      7. Effluent Water System.
      8. Irrigation System.