Completed Projects

Water & Power

FEMCO works in the water and wastewater industry and helps make it possible for millions of people to enjoy clean water every day. A trusted & reliable construction partner to both public and private-sector clients, we providing a full range of programmatic & logistic tailor-made in planning, procurement, and construction management with advanced quality system services for STP, Sanitary, Chilled water Pumps, Water distribution ( Steel, Concrete, Fiberglass, & PVC piping ), & Fire fighting, within the maximum specialized functional intention of industrial requirements. Our in-house capabilities enable us to provide our clients with greater & dependable Quality, Schedule and Cost efficiency. Our authenticated construction crews alongside with clients to make critical decisions about constructability and equipment to self-performance crews. We offer a full spectrum of services to bring our clients' projects online, on time and within budget.

 

 Project of Technology Transfer and water purchase production by SWCC through Construction of MED-TVC unit in Shuaiba 2 Desalination Plant

  • Location: Shuaiba / K.S.A.
  • Contractor: ACWA Power SASAKURA (APS) (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
  • Client: Saline Water Conversion Corporation (SWCC)
  • Type of Project: Water & Power
  • Value (SR): 42 Millions
  • Start Date: Mar. 2017
  • Finish Date: Nov. 2018

  • Work Description: 
    Civil, Electrical, Mechanical & Instrumentation Work


  • The Scope of Work:
    • The complete package / built-up MED Evaporator Unit (91,200 m³ /day).
    • Package CVL - 02 Civil Works; earthworks, foundations, road works, Construction of Electrical Control & Switchgear Building and Discharge pit etc.
    • Package EMP - 01 Electromechanical erection works, with limited supply items such as insulation for piping materials, support materials etc.
 
 

Pipeline for Saline Water Conversion Corporation (SWCC) tank to Royal Commission tank

  • Location: Ras Al Khair / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Royal Commission for Jubail and Yanbu
  • Type of Project: Water & Power
  • Value (SR): 18.94 Millions
  • Start Date: Jun. 2017
  • Finish Date: Jan. 2018


      • Work Description: 
        Civil & Mechanical works

        • The Scope of Work:
        • • SWCC POTABLE PIPLINE
        • Addition scope was added to project 201-C01 as of Supply, Installation and testing of GRP pressure 1200 mm, 4.8 km from Saline Water Conversion Corporation (SWCC) tank to Royal Commission tank , including all required earth work
 
 
Replacement of the Halon Gas With (NOVEC 1230) Metarials (JB-R-I-0508) Phase-II Area
    • Location: Jubail / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Pan Gulf Industrial System Co.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 34.29 Millions
    • Start Date: Dec. 2014
    • Finish Date: Jan. 2018


    • Work Description: 
      Halon system (SEVO - NOVEC 1230) equipment & piping replacement work including detection & extinguish high system
  •  
     

    P&C FOR SEA WATER PUMP STATION (201-C01)

      • Location: Ras Al Khair / K.S.A.
        • Contractor: Faisal Electro-Mechanical Co. Ltd.
        • Client: Royal Commission for Jubail and Yanbu
        • Type of Project: Water & Power
        • Value (SR): 429.33 Millions
        • Start Date: Dec. 2013
        • Finish Date: Jul. 2017


    • Work Description:
    • Civil, Mechanical & Electrical Infrastructure Works.
    • The pumping station shall pump 75.000 m3 / hr sea water to the system network for Ras Al Khair Industrial City when completed.


    • The Scope of Work:
      • SEC 115 kV Power Supply: Including design & engineering works and fees to be paid for connection
      • SITE WORKS 
        • Intake Dredging Works: Dredging of intake canal as 200.000 m3 and depositing on site. Shoreline Rip Rap Protection as 9300 m2. Shoreline Interlocking blocks as 1800 m2. Toe-down to dredged channel as 630 m3.
          • Grading & Surfacing: Shaping dredged fill to achieve required grades as 200.000 m2. Crushed rock surfacing as 5000 m2
          • Roads & Car Parking: Including all applications for internal roads and parking areas up to asphalting and roadway signace & stripping. Total road asphalt is 12.000 m2.
          • Jelly Fish Basin: A saperate basin with a width as 60 m and length as 100 m, depth as 2 m to store the jelly fish and other materials collected over the filters and screens to get clean sea water.
          • Temporary Works: A temporary Cofferdam is needed to surround the Pump Station with Intake Basin. The size of the Cofferdam shall be around 60 x 100 m on plan, a surrounding fill of shall be made with a height as +2.00 m over the sea water level and sheet piling shall be done down to - 15.00 m at sea and land level including dewatering system to be able to construct the pump station at dry order till to the completion of electro mechanical installations including pumps assembly. After completion this structure shall be removed and sea water shall get into the pump station for operation.
        • SEA WATER COOLING PUMP STATION (SWCPS) 
          • MECHANICAL: DN 3,300 mm to 75 mm, as a total of 1780 meters, including related connectors as tees, flanges, stubs etc. 'A- Sea Water Cooling Pump & Equipment; Pump and Column Assembly (15.000 m3/hr) 4 nos. B- Valves, Gates and Actuators and related connectors. C- Sea Water Cooling Pump Station (SWCPS) Fiber Reinforced Plastic (FRP) Piping
          • STRUCTURAL: Pump Station and Manifold Area Structure. Excavation: 45.000 m3. Backfilling: 5.000 m3. Lean Concrete: 500 m3. Reinforced Concrete: 17,000 m3. Waterproof Membrane: 10,000 m2. Structural Steel: 240 Ton.
          • ELECTRICAL: Pump Motor Sets, 2,500 HP, 3 phase 60 HZ, 4,160V, Motor and acceessories. Area lighting, conduits, grounding, power supply and distribution etc works included
          • INSTRUMENTATION & PROCESS CONTROL:
          • All cabling, connections and accessories included.
        • HYPOCHLORITE GENERATION BUILDING 
          This is a one story r.forced concrete building as 30 x 27 m size in plan, including hypochlorination package unit (generation, storage & dosing). All related electro-mechanical piping and accessories in complete order. The facility is equipped with HVAC System, lifting and and handling equipment as 5 ton overhead travelling crane. Power supply, transformers, fire dedectors and alarm system, instrumentation and process control systems, CCTV systems are available.
      • STAFF/CONTROL BUILDING 
        A reinforced concrete office building as 34 x 35 m size in plan, for staff to use to control the facility, multi purposes with rest rooms, kitchen and mosque, as an administration building. The builing is equipped HVAC and related electromechanical equipment to serve for the facility. General telephone and data systems are available.
      • SWITCHGEAR BUILDING 
        A reinforced concrete building as 35 x 22.5 m size in plan, including an underground floor to serve as electrical switchgear building. It includes power and Pump Station power transformers as: 2 units 15/20/25 MVA ONAN/ONAF/ONAF 115kV delta-4.16/2.4 kV Wye, 3-ph, 60 hZ Power Transformers. 2 units 2.000 kVA ONAN, 4.16 kV delta-400/230V Wye, 3-ph, 60 hZ facility Power Transformers. 115 kV Gas Insulated Switch Gear Equipment. 115 kV Gas Insulated Bus. Neutral Grounding Resistors, All related cabling, trays, grounding systems, panels, instrumentation and process control equipment included.
      • GUARD HOUSE 
        A one story reinforced concrete building as 4.0 x 7.7 m in size for security guards to control exit/entry to the facility. Including needed WC and HVAC system.
      • SEC BUILDING 
        A single story reinforced concrete building as 11.7 x 6.7 m in size for SEC connection and related operations. This building and systems shall be re-designed regarding SEC regulations and conditions, after approvals it shall be constructed.
      • WORKSHOP BUILDING 
        A workshop building with reinforced concrete foundation systems and steel fabrication superstructure to serve to the facility as a workshop with related equipment. There is a 40 ton overhead travel crane for maintenance purposes. The building height is 14.50 m covered with corrigated panels. It includes HVAC system, WC units and offices for staff and crew.
      • 115 kV POWER SUPPLY 
        This cabling application shall be done after SEC approval, by underlying 115 kV cabling system as approved, including all related trenches, underpasses at location, regarding the regulations of SEC.
  •  
     

    Technical Services in First & Second Phase of Desalination Plants in Yanbu and Al-Madinah Al-Monawarah

      • Location: Yanbu / K.S.A.
        • Contractor: Faisal Electro-Mechanical Co. Ltd.
        • Client: Saline Water Conversion Corporation (SWCC)
        • Type of Project: Water & Power
        • Value (SR): 20.86 Millions
        • Start Date: Aug. 2013
        • Finish Date: May. 2016


    • Work Description: 
      Technical manpower supply


    • The Scope of Work:
      • Maintenance technical manpower for Boiler & Desal Phase 1 - 2 and R.O.
  •  
     
    Supply, Fabrication & Installation of Chilled Water Pipelines With Insulation at Shuqaiq 
    Plant (SQ / R / M / 723)
      • Location: Shuqaiq / K.S.A.
        • Contractor: Faisal Electro-Mechanical Co. Ltd.
        • Client: Saline Water Conversion Corporation (SWCC)
        • Type of Project: Water & Power
        • Value (SR): 1.16 Millions
        • Start Date: May 2015
        • Finish Date: Feb. 2016


    • Work Description: 
      Mechanical works


    • The Scope of Work:
      • Supply & Fabricate the Chilled Water Pipelines.
      • It is the actual Routing & Installation of Chilled Water Lines.
      • Insulating them at site with Proper Supports and Tie-in to the existing system.
      • Providing temporary cooling arrangments to individual rooms and in M.C.R
  •  
     

    Modification of Bearing Cooling System for the Main Sea Water Pumps in Pump Station 1 & 2 Al-Jubail

    • Location: Jubail / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Power and Water Utility Company for Jubail and Yanbu (Marafiq)
    • Type of Project: Water & Power
    • Value (SR): 6.76 Millions
    • Start Date: Sep. 2014
    • Finish Date: Mar. 2015


    • Work Description: 
      Civil, Mechanical, Electrical & Instrumentation works


    • The Scope of Work:
      • Engineering Procurment Construction contract for Upgrade & Automation of Bearing cooling system for main Seawater Pumps.
     
     
    • Design, Supply and Construction Of The Pump Station and The Pipe Connecting the Pump Station To the Existing Pipe Strip Tied - In to RQWTS Operating Tank
      • Location: Jubail / K.S.A.
      • Contractor: Faisal Electro-Mechanical Co. Ltd.
      • Client: Power and Water Utility Company for Jubail and Yanbu (Marafiq)
      • Type of Project: Water & Power
      • Value (SR): 6.76 Millions
      • Start Date: Sep. 2014
      • Finish Date: Mar. 2015


    • Work Description: 
      Civil, Mechanical, Electrical and Instrument Work


    • The Scope of Work:
    • Pump House
      • Design, Prepare and Excute the Construction Of Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
      • Construction of LV Switchgear Room in side Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
      • Supply and Installation of 2.5 Tons Electric Overhead Crane
      • Supply & Installation of 3 nos of Pump w / Motor; Flow rate: 1000m³/h, Head: 40 mts (4 bar)
      • Supply and Installation of Carbon Steel Pipes, Fittings & Flanges for Suction & Discharge Side of Pumps
      • Supply and Installation of Valves for Suction & Discharge Side of Pumps
    • Valve Chamber
      • Design, Prepare and Excute the Construction Of Flow Control By-Pass Valve Chamber about 8.1 mts (L) X 4.6 mts(W) X 3.85 mts(H)
      • Supply and Installation of Flow Control, Butterfly Valve and Carbon Steel Pipes & Fittings for Valve Chamber
     
     
    Supply & Piping on "SA" System to Abha Reservoir at SWTF – Shuqaiq. SQ-R-M-779
    • Client:Location: Shuqaiq / K.S.A.  
    • Contractor: Faisal Electro-Mechanical Co. Ltd. Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 2.44 Millions
    • Start Date: Jun. 2014
    • Finish Date: Jan. 2015


    • Work Description: 
      Civil & Mechanical works


    • The Scope of Work:
      • Excavation and backfilling. Removal of existing 42' pipes, fittings & flanges and replace with the new one of 42", 36", & 24" pipes, fittings & filanges.
     
     
    RW/P/E/018 Replacement of Medium Voltage Panels 13.8 kV from Pump Station 1 to Pump Station 4 for Line C and Replacement of the Bus Duct feeding the Panel in Pump Station 1
      • Location: Jubail to Riyadh / K.S.A.
        • Contractor: Faisal Electro-Mechanical Co. Ltd.
        • Client: Saline Water Conversion Corporation (SWCC)
        • Type of Project: Water & Power
        • Value (SR): 12.95 Millions
        • Start Date: Apr. 2014
        • Finish Date: Mar. 2015

    • Work Description: 
      Electrical Works


    • The Scope of Work:
      • Removal existing and new installation of MV Panels Pump Station 1 to Pump Station 4.
      • Removal existing and new installation of MV Bus Duct.
      • Termination, testing and commissioning.
     
     

    Pertaining to Installation of New Steel Pipe for Al Ghat - Buraida Pipeline Ring Road Crossing. SWCC/RQWTS - Al Ghat to Buraida Pipeline

    • Location: Al Ghat. Buraida / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 23.58 Millions
    • Start Date: Jan. 2012
    • Finish Date: Dec. 2012

    • The Scope of Work:
      • Installation of 64" Product Carbon Steel Pipes
      • Installation of 80" Sleeve Carbon Steel Pipes
      • Thrust boring works.
      • FEB & 3 layer coating
      • Cathodic Protection
     
     
    • WETICO - Jeddah SWRO III Project (240 Million Liters Per Day)
    • Location: Jeddah / K.S.A.
    • Contractor: WETICO (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: WETICO
    • Type of Project: Water & Power
    • Value (SR): 30.17 Millions
    • Start Date: Aug. 2011
    • Finish Date: Sep. 2013


    The Scope of Work:
      • RO Trains 1st & 2nd Pass, 254 SMO & 316 L stainless pipes fabrication and erection works
      • RO Trains rack installation
      • Pressure Vassals (4,464 nos.) & Membrane (13,168 nos.) installation works.
      • HP high pressure pump installation.
      • Static mixer, valves, flow metersetc. installation.
      • Flushing and product pumps installation.
      • CIP system, Carrier water system and Calcium Hypoclorite system pumps & erection works.
      • Utilities piping works
      • Electrical & Instrumentation Control system erection works.
      • Grouting works for electro-mechanical activities
     
     
    RW/P/E/018 Replacement of Medium Voltage Panels 13.8 kV from Pump Station 1 to Pump Station 4 for Line C and Replacement of the Bus Duct feeding the Panel in Pump Station 1
      • Location: Jubail to Riyadh / K.S.A.
        • Contractor: Faisal Electro-Mechanical Co. Ltd.
        • Client: Saline Water Conversion Corporation (SWCC)
        • Type of Project: Water & Power
        • Value (SR): 12.95 Millions
        • Start Date: Apr. 2014
        • Finish Date: Mar. 2015

    • Work Description: 
      Electrical Works


    • The Scope of Work:
      • Removal existing and new installation of MV Panels Pump Station 1 to Pump Station 4.
      • Removal existing and new installation of MV Bus Duct.
      • Termination, testing and commissioning.
     
     

    Pertaining to Installation of New Steel Pipe for Al Ghat - Buraida Pipeline Ring Road Crossing. SWCC/RQWTS - Al Ghat to Buraida Pipeline

    • Location: Al Ghat. Buraida / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 23.58 Millions
    • Start Date: Jan. 2012
    • Finish Date: Dec. 2012

    • The Scope of Work:
      • Installation of 64" Product Carbon Steel Pipes
      • Installation of 80" Sleeve Carbon Steel Pipes
      • Thrust boring works.
      • FEB & 3 layer coating
      • Cathodic Protection
     
     
    • WETICO - Jeddah SWRO III Project (240 Million Liters Per Day)
    • Location: Jeddah / K.S.A.
    • Contractor: WETICO (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: WETICO
    • Type of Project: Water & Power
    • Value (SR): 30.17 Millions
    • Start Date: Aug. 2011
    • Finish Date: Sep. 2013


    The Scope of Work:
      • RO Trains 1st & 2nd Pass, 254 SMO & 316 L stainless pipes fabrication and erection works
      • RO Trains rack installation
      • Pressure Vassals (4,464 nos.) & Membrane (13,168 nos.) installation works.
      • HP high pressure pump installation.
      • Static mixer, valves, flow metersetc. installation.
      • Flushing and product pumps installation.
      • CIP system, Carrier water system and Calcium Hypoclorite system pumps & erection works.
      • Utilities piping works
      • Electrical & Instrumentation Control system erection works.
      • Grouting works for electro-mechanical activities
     
     
    Jubail Plant Phase II Service Water Piping Replacement Works
    • Location: Jubail / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 8.3 Millions
    • Start Date: Oct. 2009
    • Finish Date: Apr. 2010


    • Work Description: 
      Piping works

    • The Scope of Work:
      • Removal of CS pipe fittings (1" to 8")
        • Supply installation new RTR pipes of fitters and piping supports (1" to 8") appro. 11.3 km.
        • Supply installation of Brons & CS valves (1" to 8") 1105 nos.
     
     
    Pipeline Coating Rehabilitation (RWR-R-P-100)
    • Location: Jubail / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 44 Millions
    • Start Date: Jul. 2009
    • Finish Date: May 2010


    • Work Description: 
      Carbo steel 60" pipeline A & B STOPAQ (visco elastic coating) coating Works (13km)

    • The Scope of Work:
      • Excavation
        • Removal of existing polyethylene coating
        • Surface preparation (sandblasting of existing pipes)
        • Application of new protective coating (Visco elastic coating)
        • "Holiday" insulations testing
        • Backfilling / compacting / restoration of berm
        • Replacement of fence, post for vent valves etc.
        • Fabrication / installation of reinforced concrete culvert pipes
        • Sand stabilization
     
     
    Jeddah RO III (DHI / JedRO / SA / MSE / OOI) (240 Million Liters Per Day)
    • Location: Jeddah / K.S.A.
    • Contractor: Doosan Heavy Industries & Construction (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 57.94 Millions
    • Start Date: Jul. 2009
    • Finish Date: Sep. 2013


    • Work Description: 
      Electrical, Mechanical, & Civil Works for Taprogge Filters

    • The Scope of Work: 
      Progress of Equipment and Piping installation
      • Sea Water Supply Pumps and Screening Equipment
        • Air Compressor System
          • Cartridge Filters
          • Electro Chlorinator Systems
          • Ferric & Polymer Dosing System
          • DMF Back Wash Pumps
          • Filtered Water Pumps
          • Steel Structure (Platform, Pipe Rack, etc.)
          • RO Building: 1st Pass Booster HP Pumps, Turbo Charger, Permeator Pressure Vessels
          • Electrical, Instrumentation & Control system
          • Electrical Equipment: 90 MVA, 380kV GIS and 380/13.8k Transformers
          • 13.8kV and 480V Switchgears, UPS, Rectifiers, 13.8kV/480V Aux.
          • Transformers Cable Trays and bridges.
          • Testing and Commissioning
     
     
    Taprogge Filters for Main Sea Water Header & Sea Water Desal Header with disposal System
    • Location: Jubail / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Termomeccanica Saudia Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 15.2 Millions
    • Start Date: Apr. 2007
    • Finish Date: Feb. 2008


    • Work Description: 
      Electrical, Mechanical, & Civil Works for Taprogge Filters


    • The Scope of Work:
      • Installation of 2 nos. dia. 120" and 6 nos. dia. 60" Debris Filter and Debris Container.
        • Supply & Installation of RTR Pipes with Fittings (dias. 120", 108" & 60") for Topragge Filter and Drain System.
        • Elect. System: Supply & Installation, of all necessary Cables, Accessories, & Termination for Start-up.
        • Supply & Erection of Main Chamber for 2 nos. 120" Debris Filter & Drain Pit, and Line Civil Works.
     
     
    Provision of Isolating Facility – RQWTS Valve Chamber (HPT)
    • Location: Riyadh / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 2.2 Millions
    • Start Date: Sept. 2005
    • Finish Date: May 2006


    • Work Description: 
      Electrical, Mechanical & Civil Works for 80" Butterfly Valve

    • The Scope of Work:
      • Excavation and Removal of two nos. of Standard PCCP Pipes – dia. 2000 mm x 15 meters long.
      • Installation of Temporary By-Pass Line – dia. 800 mm with 2 x 90 deg. Elbows.
      • Construction of Valve Chamber (3000 W x 5300 L x 7920 mm H )
      • Supply & Installation of dia. 2000 mm Isolating Butterfly Valve, with Flange Adaptors and Hardware.
      • Supply & Installation of dia. 2000 mm PCCP Pipe with Fittings
      • Installation of Thrust Blocks for Bulk Heads & subsequent Removal together with Temporary By-Pass Line.
     
     

    Refurbishment Works of Jeddah Phase 4 - Desal. Plant (Contr:Nos. 8/1/1/260 & 261)

    • Location: Jeddah / K.S.A.
    • Contractor: ACWA Power SASAKURA (APS) (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 40.5 Millions
    • Start Date: Sep. 2004
    • Finish Date: Apr. 2007


    • Work Description: 
      Rehabilitation Works of Evaporator Tube Bundles and modification of Vacuum System

    • The Scope of Work:
      • Removal and Replacement of Brine Pipes, Sea Water Pipes, Water boxes, Demisters & Manhole Covers.
      • Tube Bundles Demolishing & Replacement.
      • Removal and Replacement of: Vent Pipes, Tube Sheets Necks, Tube Support Plates and Intermediate Tube Sheets.
      • Insertion & Expanding of 53,200 nos. of 90/10 Cu.Ni. Tubes (O.D 19 mm x 25000 mm length.) with subsequent 
        Leakage Test using Pressure Air.
      • Cleaning, Rust Removal, Sandblasting, & Coating Works.
      • Lining Works ( mounting SS lining material on evaporated internal surface above Demister for Corrosion Protection 
        after cleaning )
      • Modification of Evaporator Venting & Vacuum System, Brine Gate Cover and inspection of Brine Heater Tubes.
      • Replacement of Pump Suction & Discharge Valves and Leakage Test.
      • All related Elect. & Instrumentation Works.
     
     
    Tank Farm Piping for MSF & RO Plants
    • Location: Jubail / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 3.5 Millions
    • Start Date: Jul. 2003
    • Finish Date: Jul. 2004


    • Work Description: 
      Piping Works

    • The Scope of Work:
      • Dismantling & Removal of dia. 32" Temporary Link Line, and dia 36" Temporary Suction Line, and dia. 36
        Temporary By-Pass Line, together with Butterfly Valves and Drain & Vent Valves.
        • Supply and Installation of Piping in the Pump House of Blending Station – BS 1.
        • Supply, Laying & Embedding of new Link Line ( for MSF 1 ) of dia. 32", 36", & Branch - off Line dia. 48" together 
          with Valves.
        • Supply & Installation of Power Supply & Control Equipment for new monitoring equipment of Phase 1 Line of dia. 36
          ( Flow meters, Hardness Analyzer, pH analyzer )
        • Supply & Installation of 3 nos. Valve Chambers, Cable Duct banks, and Manholes for Elect. System.
        • Civil Works for Yard Shaft & Cable Pulling Shafts.
     
     
    Hofuf Water Transmission System
    • Location: Khobar / K.S.A.
    • Contractor: Rashid / KSB Fluid System Gmbh (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 4.6 Millions
    • Start Date: Dec. 2002
    • Finish Date: June 2004


    • Work Description: 
      Electro – Mechanical Installations and Testing & Commissioning Works

    • The Scope of Work: 
      Mechanical Work:
      • Installation of Pumps.
        • Installation of Surge Vessel and Surge Tank.
        • Installation of SVP Compressor Unit.
        • Fabrication & Installation of Pipes.
        • Installation of Wall Ducts for Drain Stations.
        • Installation of Butterfly Valves, Platform, & Ladder of the Vessel.
        Electrical Works:
        • MV Cable termination.
        • Instrumentation Works in OPS Pump Area.
        • Installation of OPS & EPWTS Interface.
        • SVP instrument Installation, Cabling & Termination
        • Elect. Installation for HOFUF Yard Shafts 2 & 3.
     
     
    Riyadh – Qassim Water Transmission System Station & Terminal Construction - 4
    • Location: Al Qaseem / K.S.A.
    • Contractor: Yuksel Insaat Saudia Co. Ltd. (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 9 Millions
    • Start Date: May 1998
    • Finish Date: Jun. 2001


    • Work Description: 
      Electrical – Mechanical Erection Works

    • The Scope of Work:
      • Installation of 26 nos., 26 mtrs. high, weighing 56 Tons each of Surge Vessel - dia. 2,300 mm & capacity 220 cu. mtrs. with all Auxiliary Air & Water Piping, of size ranging from 2" to 48".
        • Structure designed to withstand wind load with peak wind velocity of 45 cm per sec. (gust included) and with max. 80 deg. C0. metal temperature under direct Sun.
        • Installation of Compressor Units, 48" dia. Motor Operated Valves, and 26 Tons Relief Valve Skid.
        • Installation of HVAC, Fire Alarm, Fire Protection System at all Buildings.
        • Laying & Termination of Cables for Power, Instruments & Controls.
        • Supply & Installation of Lighting System at all areas.
        • Installation of Electricals & Instrumentation at Surge Vessel Area & Terminal building.
        • Testing & Commissioning of All Systems.
     
     
    Electro - Mech. Works for Jubail – Riyadh Line 'C' High Point Terminal
    • Location: Al Qaseem / K.S.A.
    • Contractor: Yuksel Insaat Saudia Co. Ltd. (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 9 Millions
    • Start Date: May 1998
    • Finish Date: Jun. 2001


    • Work Description: 
      Electrical – Mechanical Erection Works

    • The Scope of Work:
      • Installation of 26 nos., 26 mtrs. high, weighing 56 Tons each of Surge Vessel - dia. 2,300 mm & capacity 220 cu. mtrs. with all Auxiliary Air & Water Piping, of size ranging from 2" to 48".
        • Structure designed to withstand wind load with peak wind velocity of 45 cm per sec. (gust included) and with max. 80 deg. C0. metal temperature under direct Sun.
        • Installation of Compressor Units, 48" dia. Motor Operated Valves, and 26 Tons Relief Valve Skid.
        • Installation of HVAC, Fire Alarm, Fire Protection System at all Buildings.
        • Laying & Termination of Cables for Power, Instruments & Controls.
        • Supply & Installation of Lighting System at all areas.
        • Installation of Electricals & Instrumentation at Surge Vessel Area & Terminal building.
        • Testing & Commissioning of All Systems.
     
     
    20 MIGD SW RO Plant Al-Jubail Desalination Plant
    • Location: Jubail / K.S.A.
    • Contractor: Yuksel Insaat Saudia Co. Ltd. (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 12.3 Millions
    • Start Date: Sept. 1995
    • Finish Date: Nov. 1998


    • Work Description: 
      Civil, Structural, Mechanical, & Electrical Works

    • The Scope of Work:
      • Fabrication, Painting, & Erection of about 835 MT of Steel Structure.
        • Erection of 669 sq. mt. of Steel Cladding
        • Fabrication & Installation of Assorted Piping: viz. 6,000 MT of RTR Pipes 4" to 84" dia., 5,000 MT. of S S Pipes 1" to 16" dia., 2,000 MT of Pvc & uPVC Pipes 2" to 8" dia. and 7,500 MT. of Cu. / GI Pipes 1" to 8" dia. and Pipe Racks.
        • Sandblasting, Painting and Installation of CS Pipes, and Insulation & Al.
        • Jacketing of Pipes.
        • HVAC Works.
        • Erection, Testing & Commissioning of Equipment: viz. High Pressure Pumps coupled with Motors & Recovery Turbines, Vertical Multi-stage Pressure pumps, Back-wash & Feed Pumps, Air Blowers, Compressors, Chemical Dozing Pumps, Static Mixers, Chemical Process Units, Exhaust Fans, Motor Operated Valves, and Over-head Cranes.
        • Laying, Termination & Testing of MV / LV Cables & Cable Racks for Building, Street / Security Lighting, Instrumentation & Control System, Data & Communication System.
        • Earthing & Bonding System for entire Plant.
     
     
    Yanbu Desalination and Power Plant – Phase 2
    • Location: Yanbu / K.S.A.
    • Contractor: Yuksel Insaat Saudia Co. Ltd. (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Water & Power
    • Value (SR): 2.7 Millions
    • Start Date: Sep. 1995
    • Finish Date: Jun. 1996

      • Work Description:
      • Electro – Mechanical Works for:Chimney Housing Compound

      • The Scope of Work:
        • Chimney:
          • Electro – Mechanical Works on Plant Chimney (95 Mtrs. Height).
            • Installation of Gas Ducts and Insulation Works for Boilers.
            • Supply & Installation of Lighting, Power, Lightning Protection and Grounding Works.
            • Piping, Sanitary, & Plumbing Works.
        • Housing Compound:
          • Mechanical, Plumbing, & HVAC, Works for Restaurant Building, and Housing.
            • Electrical Works - Lighting & Power.
     