Completed Projects

District Cooling & Infrastructure

With global economic prosperity of industrial development, and as integral part of the region's economic growth, FEMCO have taken on the role & considerably succeeded for being integrated with market competition environment and being awarded with distinctive contracts with highly prestigious clients. FEMCO have established robust industrialized implementation of know-how in engineering, procurement, & construction facilities for Electro-Mechanical activities in District cooling & Infrastructure equipment of Chiller Plants, Cooling towers, LPG, Power distribution & generations, Transformers, M & H voltage Cabling, Instrumentation & control along with optimal sustainability of network piping quality services.

 
 

Completion of Infrastructure for Housing of University City (Generators - Synchronization Panel)

  • Location: Dammam / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Imam Abdulrahman Bin Faisal University
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 36.86 Millions
  • Start Date: Oct. 2017
  • Finish Date: Dec. 2018

  • Work Description:
    • Civil & Electrical Work


  • The Scope of Work
      • • Supply, Installation, Testing and Commissioning Architectural Finishing works, Low Current Works, Electrical-Mechanical Equipment and Building Works for Existing Generator Housing Plant for University Hospital Building, such as; Supply and Installation of Celling Works, Flooring Works, Wall Covering Works, Painting Works, Door and Louvers Works, Toilet Accessories Works. Supply, Installation, Testing and Commissioning BMS System, Fire Alarm System, CCTV System, Data Works, Building Lighting and Power Outlet Works, MV/LV Cable Works, MV Switchgear Works, Generator Equipment's and Accessories Works, UPS Equipment Works, Over Head Crane Works, Fire Fighting Works FM-200, HVAC Works, Plumbing Works.
 
 

Wadi Jeddah “Infrastructure Works for Projects of King Abdulaziz University Northern Area

  • Location: Jeddah / K.S.A.
  • Contractor: Faisal Electro-Mechanical Co. Ltd.
  • Client: Wadi Jeddah
  • Type of Project: District Cooling & Infrastructure
  • Value (SR): 291.39 Millions
  • Start Date: May 2016
  • Finish Date: May 2018


  • Work Description:
    • Civil, Mechanical, Electrical and Instrument Work.


  • The Scope of Work
  • • Civil works :  Additional Fluid Cooler Building
  • • Supply & Installation of total 12 number Chillers capacity of 2180 RTon/each
  • • Supply & Installation of 30 number Fluid Coolers (60 number fans(16feet/4.88meter dia/each)
  • • Supply & Installation & Modification of total 30 Pumps (Condenser Water Pumps, Chiller Pumps and Distribution Pumps)
  • • Supply & Installation of Valves size 1050mm. dia and below ( Isolation, Flow Control, Triple Duty etc)
  • • Supply & Installation of Pre-insulated Carbon Steel Pipes & Fittings size 1350mm. dia and below (Chilled Water Pipes – Aboveground)
  • • Supply & Installation of Pre-insulated RTR Pipes & Fittings size 750mm. dia and below (Chilled Water Lines Underground)
  • • Supply & installation of 6 numbers 13.8/0.38 KV Dry type Transformers, (capacity 1500/2250 KVA & 2000/3000 KVA)
  • • Supply & installation of MV & LV Cables
  • • Supply & installation Building Management System (BMS)
  • • Supply & installation 6 nos. Motor Control Center including all motor,starters, relays etc.
  • • Supply & installation All electrical works (lighting, power, panel boards, .grounding & lightning protection)
  •  
     

     Infrastructure in Girls Colleges in Al Rayyan Complex in Dammam

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. - Yuksel Insaat Saudia Co. Ltd.
    • Client: University of Dammam
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 349.92 Millions
    • Start Date: Jun. 2013
    • Finish Date: Apr. 2017


        • Work Description:
          • Civil, Mechanical & Electrical Infrastructure Works, Project is divided to two stages, Package 1 & 2.


        • The Scope of Work
          • Chiller Plant: Total cooling 24,000 tons, Closed Cooling Towers, Chilled Water & Cooling Tower Pumps, MV Switchgear, Power Transformer, Motor Control Centers, MV Softstarters, ATS & Fire Alarm.
          • Water Tanks & Pump Room: Domestic Water & Fire Fighting & Pump Room, Irrigation Water Tank & Pump Room, Collection Raw Water Tank & Filter Pump Room, Potable Water Tank & Pump Room, Collection Raw Water Tank & Water Treatment Plant, Sewage Lifting Station (2 nos), Storm Lifting Station, Waterwell with all corol, Electro-mechanical Works.
          • MV Switchgear: FM200 fire protection, MV Switchgear for Campus Buildings.
          • Emergency Generation Plant: Diesel Generators (total 16 MVA), Diesel Storage & Distribution Network, Step-up Transformers & MV Synchronizing & Distribution Switchgear, Foam Fire Suppression Systems.
          • Service Tunnel: (5.5 km) for Electro-mechanical Netwroks (Chilled Water, Fire Water, Raw Water, Irrigation Water, Potable Water, MV Network, Low Current System Backbone Cables) for all campus.
          • Main Control Room: All campus.
          • Gates: Secondary Gates & Service Gates (total 20 nos) wall all colol & Electro-mechanical works.
          • Retaining Wall: Parking areas.
          • Road Works: (175,000 m2) with excavation, backfilling, subbase, base courses, binder & wearing asphalt courses, curb stones (23 km), road marking & signs.
          • Utility Networks: Storm Drainage Network (4,400 mt), Sewage Network (4,100 mt), Potable Water Network (9,000 mt), Domestic Water Network (9,000 mt), Irrigation Network & Accessories (65,755 mt), Fire Fighting Network (10,300 mt), Chilled Water Network (10,300 mt), LPG Network (), Voice Network (4,200 mt), Data Network (4,200 mt), CCTV Network (4,200 mt), Public Address (4,200 mt), Fire Alarm Network (4,200), MV Distribution Network (29,000 mt), Sreet Lighting & Network with Package Substation (28 nos), Lighting Poles (810 nos), Control Panel - LV Distribution (19,000 mt), Building Management System & Network.
     
     

    Completion of Fencing Works from Gate No. (2) to Electrical Substation

    • Location: Al Hofuf / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Sasel Saudi L.L.C
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 8.52 Millions
    • Start Date: Sep. 2014
    • Finish Date: Mar. 2015


    • Work Description: 
      Civil, Mechanical, Electrical & Infrastructure works


    • The Scope of Work:
      • Removing and installation of fence around the university with aproximately 900 mt.
      • length and excavation 1000 m3 including all lighting works, cctv and fire alarm.
      • Removing and installation of gate of university including all civil, electrical and mechanical works
  •  
     

    Project of Supplementation of Infrastructure for the University City Third Phase (Lift Station)

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Sasel Saudi L.L.C
    • Client: University of Dammam
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 19.52 Millions
    • Start Date: Aug. 2014
    • Finish Date: Mar. 2016


    • Work Description: 
      Civil, Electrical, Mechanical and Instrument works.


    • The Scope of Work:
      • Gravity Pipeline; Catch Basins for GRP. GRP pipes 400, 600, 700, 800, 900, 1000, 1200mm dia. GRP manholes having 1200, 1500mm dia.
      • Lift Station; Excavation support secant piles.Total 1612m2 wall to be constructed.Tension piles underneath the lift station.Ductile Iron Pipe and fittings to be supplied and installation. Submergible pumps with motor and control panel, vapor barrier membrane, Compartment System waterproofing, ceiling mounted weather proof fluorescent lighting fixture, grounding, MV cables.
      • Force Main Pipeline; Supply and laying and install GRP pipe with Air Release Valve.
      • Electrical Room construction for Generator; Construction of Electrical room for Generator and Package substation, Supply and install the Package Substation and one unit of the Generator with storage fuel tank, Underground FRP fuel, Auto Transfer switch, grounding, MCC and ICP.
  •  
     
    • Upgrading of Medium Voltage Distribution Network (4160) Volt and the Protection System for the Local Generation Station at the Central Services Complex

    • Location: Riyadh / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Saud University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 22.26 Millions
    • Start Date: May. 2014
    • Finish Date: Feb. 2016


    • Work Description: 
      Electrical Replcaement Works


    • The Scope of Work:
      • Generator protection update, Battery charger for Turbine Generators, UPS uninterrupted power supply system, Induction Motor squirrel cage 700 HP / 4160V, Potential Transformer (type Tested) Metal Enclosed, Automatic transfer switch with enclose 600A & 400A, (MCC's) arc resistance metal enclosed MCC 4160V (incoming C.B. 1200A with 28 (Nos) Motor starters), (Incoming+ TIE C.B with 6. (Nos.) Motor starters), Single core cable (1x240, 1x95, 1x70, 1x35, 1x16mm2) CU-XLPE/PVC-5K.v, (1x70, 1x35, 1x10 mm2) CU-PVC-600v, Instrumentation cable 16AWG XLP/PVC, Control cables 12 AWG XLP/CPE, Station (start-stop Emergency), Chiller distribution panel 380/220V (DP-3), Motor control center for chiller auxiliary, L.V cables single core, section 150 & 50mm2 copper, insulation rate 1000V, Ground cable 50 & 16mm2, Metal preparations, 5 pipes, Dia 3 inches, Metal preparations, 2 pipes, Dia 2 inches.
     
     

    KAU - Female 200

    • Location: Jeddah / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: King Abdulaziz University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 69.42 Millions
    • Start Date: Feb. 2014
    • Finish Date: Nov. 2015


      • Work Description: 
        Civil, Mechanical & Electrical Replacement Works

        • The Scope of Work:
          • Handicapping & Landscaping work.
          • Parking area.
          • Asphalt work; 39,000 m².
          • External lighting.
          • Chilled water piping work (6" to 20") - 3560 mt.
          • Potable water piping work (50mm to 200mm Dia) - 2365 mt.
          • Sewage water piping work (110mm to 500mm Dia) - 3445 mt.
          • Irrigation system (20mm to 110mm Dia) - 3550 mt.
          • MV cable 400mm² - 14,400 mt.
          • LV cable system.
          • Cable duct bank for MV & LV
          • Compact substation 400 V - 1500 kVA (2 nos) and 1000 kVA (14 nos).
          • Generator 875 kVA (4nos) and 1500 kVA (2nos).
          • Telecommunication system.
     
     

    Project to Furnish, Install, Test & Commissioning of Water Cooled Centrifugal Chillers and Vapor Absorption Chillers in AC Station

    • Location: Dhahran / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Fahd University of Petroleum and Minerals
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 9.05 Millions
    • Start Date: May. 2013
    • Finish Date: Nov. 2014


      • The Scope of Work:
        • Replacement of 4 x 550 Rtons, 1 x 750 Rtons Water Cooled Centrifugal Chillers
          • Replacement of 2 x 250 Rtons, 2 x 200 Rtons Vapor Absorption Chillers
     
     

    Main Chilled Water Piping For Faculty Housing

    • Location: Jeddah / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. - Yuksel Insaat Saudia Co. Ltd.
    • Client: King Abdulaziz University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 43.87 Millions
    • Start Date: May. 2013
    • Finish Date: Jan. 2014


      • The Scope of Work:
        • Supply and installation Chilled water pipilines. Pre-insulated pipes. 750, 600, 450, 400, 350, 300 mm diameter pipes total 7950 meter.
          • Supply and installation Packaged ETS Plant; Stainless Steel Double Plate Heat Exchanger, Structural Steel Base, Insulated Double Wall Plant Enclosure, Pumps, Motors and controllers including VFD Drive, Air Separator and Make-Up Water System, Expansion Tank, Chemical Treatment Systems and Chemical Pot Feeder, Valves, Gauges and Piping Accessories, Pipe and Pipe Supports, Pump Vibration Isolation. Electrical Equipments within Packaged ETS plant. DDC Control System with remote workstation Interface Panel. (7 nos. ETS Module. a- 1897Tons (6671.75Kw), b- 2520Tons (8862.84Kw), c- 3010Tons (10586.2Kw), d- 1964Tons (6907.4Kw), e- 2464Tons (8665.89Kw), f- 840Tons (2954.3Kw), g- 1768Tons (6218.1Kw), flanged ends.)
     
     

    Addition of Chillers for Enhancement of the Air-conditioning in King Khalid Medical City in King Saud University

    • Location: Riyadh / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Saud University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 21.67 Millions
    • Start Date: Feb. 2012
    • Finish Date: Nov. 2013


    • The Scope of Work: 
      HVAC
      • Supply and install nine cooling towers, type closed loop, heat rejection 7,497,000 BTU / Hr. each water flow 1,500 GPM, 60HP fan motor.
        • Supply and install three water cooled Chillers each 1,500 ton of refrigeration and single compressor.
        • Complete installation of piping network for chilled water system with instrumentation, control, expansion join and valves.
        • Supply and install three Chilled water pumps centrifugal constant flow double suction split case type water flow rate 2,000 GPM @ 126ft. TDH, 200 HP motor, including control panel.
        • Supply and install three Condenser pumps centrifugal constant flow double suction split case type water flow rate 4,500 GPM @ 130ft. TDH, 300 HP motor, including control panel.
        • Supply and install one Distribution pump centrifugal constant flow double suction split case type water flow rate 4,400 GPM @ 100ft. TDH, 200 HP motor, including control panel.
          FIRE FIGHTING SYSTEM
          • Supply and install CO2 cylinders system, 180 Kgs capacity including pipes, nozzle outlet, heat detectors for three chills.
     
     

    Dammam University Infrastructure - Phase: 3 Underpass Construction

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: University of Dammam
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 215.05 Millions
    • Start Date: May 2011
    • Finish Date: Nov. 2013


      • The Scope of Work: 
        The undepass will be built on the road between new and old campus of university. Total length is 952 meter and width is 30 meter. Project includes second pile shoring system, tensile piles under raft, concrete and road works.
     
     

    Development & Expansion of Central Chiller at King Saud University

    • Location: Riyadh / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Saud University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 149.5 Millions
    • Start Date: Apr. 2011
    • Finish Date: Apr. 2014


    • Work Description: 
      Development & Expansion of Central Chiller


    • The Scope of Work:
      • 6 unit 5000 RT Chillers replacements
      • Chilled water and Condenser water Pumps replacements
      • Various Valves Replacements
      • Varoius Cables works, Control Panels, Tele-Communication and Data System, CCTV, Instrumentation Works replacements
      • Review and upgrade existing structural system of building and replacement of Overhead Crane.
     
     

    Preparation of Infrastructure for the University City in Al-Ahsa, Phase-4,(King Faisal University Permanent Campus in Al-Ahsa)

    • Location: Al-Ahsa / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 143.07 Millions
    • Start Date: Mar. 2011
    • Finish Date: Jun. 2013

    • Work Description: 
      The Infrastructure Phase-4 Stage–1 A project is located along the Academic Area, East Loop Road, West Loop Road, Road-A, Male's Dormitory Area, and Female's Dormitory Area of King Faisal University Campus, Al – Ahsa.


    • The Scope of Work:
      • Providing full operation preventive maintenance and overall maintenance for electro-mechanical network systems for campus & around 15 campus buildings.
      • Building Works including Civil, Electrical & Mechanical Works.
      • Utilities Works
      • Chiller Building Electro-Mechanical Maintenance Works.
      • Generator Building including Civil & Electro-Mechanical Works.
      • Roads & Street Improvement Works (285.000 m2 asphalt)
      • Landscape & Hardscape Works (90.000 m2 planting area)
      • Bridge, Spine Wall & Retaining Wall Works.
      • Underground Utilities such as:
        • Sanitary Sewer System (3.300 mt)
        • Storm Water Drainage System (6.500 mt)
        • Raw Water System (4.800 mt)
        • Sweet Water System (2.600 mt)
        • Well Water System (4 ea deep wells)
        • Chilled Water System (800 mt)
        • Effluent Water System.
        • Irrigation System.
     
     

    Project for Infrastructure for Housing of the University CIty in Dammam - Phase-3

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: University of Dammam
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 37 Millions
    • Start Date: Aug. 2010
    • Finish Date: Aug. 2011


    • The Scope of Work:
      • The infrastructure works of the Research Center which include 7 building
        • Sewage, storm, rows, fire, chilled water, water tanks.
        • Fire water tanks, RO plant, Pump Room, Transformer and Switch Gears, Irrigation and Landscaping of roads and parks.
     
     

    KFU Teaching Hospital Project in Al-Ahsa, Phase-1

    • Location: Al-Ahsa / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 290.8 Millions
    • Start Date: Jun. 2010
    • Finish Date: Jun. 2013

    • Work Description: 
      Civil, Mechanical, & Electrical Infrastructure & Utilities Works


    • The Scope of Work:
      • Site Leveling: 263,000 cu.mtr. of Excavation, 220,000 cu. mtr. of Backfilling, 8,000 cu. mtrs. of Concrete Works and 52,000 sq. mtrs. of Asphalt Cover Area; 10,000 mtr of Curbstone.
      • All Civil & Electro-Mechanical Works for: Supply & Installation of 6 nos. Chiller Plants of 2,150 Tons capacity, 4 nos. Boiler of 6800 kg/hrs capacity; 44 nos. Air cooler Radiators 946KW (269tons); Expansion Tanks; Air separator and Chemical Treatment equipments & Accessories.
      • All Civil & Electro-Mechanical Works for: Supply & Installation of Sewage Treatment Tank Systems (STP), Reverse Osmosis Plant (R.O), and Generator Building with 5 nos. Stand-by 2500 KVA capacity Generators, Underground Diesel Tanks; 1 nos. Raw Water Pump Room, 1 nos. Irrigation Pump Room; 1 nos. Potable/Fire Water Pump Room and 4 nos. Main Gates complete all Accessories and equipments
      • Supply & Installation of Piping Networks for Infrastructure works:
        • -Chilled Water System – 4,500 mtrs.
        • -Sanitary Sewer System – 2,200 mtrs.
        • -Potable Water System– 2,200 mtrs.
        • -Raw Water System – 2,800 mtrs.
        • -Well Water System – 3Nos. Deep well drilling works and 500 mtrs piping works.
        • -Storm Water Drainage System – 800 mtrs.
        • -Site Grading & Roads Works
        • Lift Stations – Civil &Electro.-Mechanical Works for 4 nos
        • -All Electrical Works: comprising of Supply & Installation of 4,400 mtrs.
        • of 15 KV medium voltage and Communication Network Cables, and 2,500 mtrs. of 15 KV Cu. / XLPE Cables.
      • Works related to Landscaping, Hardscaping Works, Stamp Pavement Works, Plantations, Compact Sub-Stations, and External Street Lighting Electrical Works.
     
     

    Connection Between Colleges and Administration in the University City in Dammam, Phase-2

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 8.58 Millions
    • Start Date: Oct. 2009
    • Finish Date: Jun. 2010


    • The Scope of Work:
      • Supply and installation of TV and media. Networks include all cabling network and LCD's, LED's for the medical center building. Supply and installation of huge Sculpture DNA clock in the middle of the main hall at Medical Center
     
     

    Education College Buildings in Dammam Second Phase, First Part

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 9.5 Millions
    • Start Date: Aug. 2009
    • Finish Date: Sep. 2009


    • The Scope of Work:
      • Including the infrastructure, backfill, curb stone, sub base, base coarse asphalting, interlock works of approximate 70,000 m2 road and parking.
      • Building a closed corridor with guard houses between faculty 4.6 m x 400 m.
      • All electrical work, external lighting and internal lighting and plumbing system, sewage network.
     
     

    Connection between Colleges and Administration in the University City in Dammam, Phase-1

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 10.67 Millions
    • Start Date: Mar. 2009
    • Finish Date: Nov. 2009


    • The Scope of Work: 
      • Include ducting work, fire alarm and sprinkler system, granite pavement, cladding and all electraical work, data and telephone & internet network system for the main hall and the connection between colleges and administration building.
     
     

    Site Development Base Plan for the University City in Dammam

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 45.13 Millions
    • Start Date: Jun. 2008
    • Finish Date: Aug. 2010


    • The Scope of Work:
      • Supply, installation and testing and communizing for infrastructure work for housing accommodation area 
        of the new campus
        • Irrigation network with all accessing including control system
        • Row, sweet, sewage and storm water networks
        • Fiber optic networks for all low current voltage systems
        • BMS, CCTV, Data, Telephone Network System
        • Medium voltage and low voltage cable network
        • Transformers and substations
        • External lighting
        • Road and park including backfilling, sub base, base course, and asphalting
        • Slope protection and interlock
     
     

    Preparation of Infrastructure for the University City in Al-Ahsa, Phase-3, Stage-1 (King Faisal University Permanent Campus in Al-Ahsa)

    • Location: Al Ahsa / K.S.A
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 600.95 Millions
    • Start Date: Aug. 2007
    • Finish Date: Dec. 2011


    • Work Description: 
      Civil, Mechanical, & Electrical Infra-Structure Works for Four (4) Sub - Packages as detailed below


    • The Scope of Work:
      • Sub-Package 1: All Electro-Mechanical Works for: Supply & Installation of 7 nos. Chiller Plants of 3,150 Tons 
        capacity, 6 nos. Cooling Towers of 9,290 GPM capacity & Pump Station Building with 7 nos. each of Chilled 
        Water Pumps of 3,877GPM capacity, and Cooling Water Pumps of 9,290 GPM Discharge Capacity.
      • Sub-Package 2: All Civil & Electro-Mechanical Works for: Supply & Installation of Sewage Treatment Plant (STP), Reverse Osmosis Plant (R.O), and Emergency Generator Building with 2 nos. Stand-by 1,000 KVA capacity Generators, and 2 nos. Diesel Gen-Sets of 1,000 KW capacity, and Utilities of STP & R.O.
      • Sub-Package 3:
      • Supply & Installation of Piping Networks for:
        • Chilled Water System – 14,790 mtrs.
        • Sanitary Sewer System – 9,084 mtrs.
        • Sweet Water - 8,904 mtrs
        • Raw Water Distribution System – 11,132 mtrs.
        • Well Water System – 2,021 mtrs.
        • Effluent Water Distribution System – 3,605 mtrs.
        • Storm Water Drainage System – 13,288 mtrs.
        • 8Site Grading & Roads Works
        • Lift Stations – Elec.-Mech Works for 6 nos. & Civil Works for 5 nos
        • All Electrical Works: comprising of Supply & Installation of 7,380 mtrs. of 13.8 KV medium voltage and Communication Network Cables, and 16,390 mtrs. of 15 KV Cu. / XLPE Cables.
      • Sub-Package 4: Works related to Landscaping, Hardscaping Works of Pergola & Shade Structures, Stamp Pavement Works, Water Display Networks, Irrigation System, Plantations, Drinking Water Fountains, Tennis Courts, Compact Sub-Stations, and Street Lighting Electrical Works.
      • Site Leveling: 428,000 cu.mtr. of Excavation, 1,028,000 cu. mtr. of Back-filling, 50,000 cu.mtrs. of Concrete Works and 325,000 sq.mtrs. of Asphalt Cover Area.
     
     

    Preparation of Infrastructure for the University City in Dammam Second Phase (King Faisal University Permanent campus in Dammam)

      Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. Yuksel Insaat Saudia Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 212.84 Millions
    • Start Date: Jun. 2007
    • Finish Date: Nov. 2009


    • Work Description: 
      Civil, Mechanical, & Electrical Infra-Structure Works


    • The Scope of Work:
      • Site Cleaning with Excavation / Filling of 1,230,000 cu.mtr. of Soil.
      • Construction of Roads with 590 Poles of Street Lights, Walkways, & Parking.
      • Installation of Sewer &p; Irrigation Piping, and 34 KM of Water Distribution Network.
      • Setting up of Sewage Treatment Plant of 1,600 cu.mtr. / day capacity and Sewage Pump Lifting station of 50 LPS. capacity.
      • Also Storm Water Pump Station of 250 LPS capacity is constructed.
      • Installation of 4 nos. Chiller Plants of 1,300 Tons capacity and 3 nos. Cooling Towers of 3,900 GPM capacity, & 
        laying of 1.4 KM of Hydronic Pipes, together with Chilled & Condenser Water pumps.
      • Installation of R.O Plant of 400 cu. mtr per day capacity.
      • Facilities like: Telephone & Computer Data System, Clock System, MATV, CCTV Surveillance, CCMS / BMS / Fire 
        Alarm System, Sprinklers, FM 200 Fire Suppression System & Fire Hydrants, are included.
      • Electrical Works include: Installation of 16 KM of U / G conduits for Elect.
      • Cabling.
      • 4 nos. of 1,500 KVA Generators for Emergency Power, 4 nos. Power Transformers, 1 no. MV Switchgear and 
        Installation of 28 KM of 15 KV MV Cables, 2 nos. LV Switchgear, MCCs, Power & Lighting Panels, Lighting Transformers. 10 KM of LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
      • Grounding, Bonding, and Lightning Protection System.
     
     

    Sewage Works Package 5, East side / City Fanar Project

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. Yuksel Insaat Saudia Co. Ltd.
    • Client: Rikaz Development Company
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 11.2 Millions
    • Start Date: Mar. 2005
    • Finish Date: Aug. 2005


    • Work Description: 
      Sewage System consisting of Sewage Network & Lifting Stations


    • The Scope of Work:
      • Supply & Installation of uPVC Pipes, dias. ranging from 150 to 400 mm. and FRP Pipes from 200 to 800 mm 
        dia. including Valves, Fittings, Inspection Chambers and Manholes.
      • Excavation, De-Watering, Leveling, Back-filling, Compacting and Side Slope Protection.
      • Construction of Lifting Station and Booster Lifting Station which includes Submersible Pumps, Motors, together 
        with Discharge Pipes & Fittings, Check Valve, Gate Valve and Exhaust Ducts.
      • Construction of: Fence, Gates, Walkways, Asphalting, Guard House, Generator Room, and Electrical Room.
      • Architectural Works include Concrete Masonry Units, Elastomeric Membrane Roofing System, Steel Doors & 
        frames, Aluminum Windows, Plastering, Painting, Tiling (interior & exterior) and Toilet Fittings.
     
     

    Preparation of Infrastructure for the University City in Dammam Phase 4 & 6, Utility Works. (King Faisal University Permanent Campus in Dammam)

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 101.39 Millions
    • Start Date: Mar. 2005
    • Finish Date: Nov. 2007


    • Work Description: 
      Civil, Mechanical, & Electrical Infrastructure Works


    • The Scope of Work:
      • Excavation & Back-filling of 1,362,694 cu. mtr. of Soil, Construction of 107,700 LM of Flexible Pavements, with 92,200 LM of Curbs & Gutters and 61,000 sq. mtrs. of Sidewalks.
      • 769 LM of Underground Piping (FRP) were laid, and Water Tank of 1,800 cu.mtr. was constructed.
      • R.O Plant of 600 cu.mtr. / day capacity was installed with Water Well and 14.13 KM of Water Network Piping.
      • Sewage Treatment Plant (STP) and Sewage Lift Station is provided with Installation of 5.12 KM of Sanitary Sewage Piping.
      • 5.34 KM of Irrigation Piping has been laid.
      • 50 mtrs. of LPG Pipes ( above ground ) have been installed with 2 nos. of LPG Tanks of 40,000 USG capacity.
      • 2 nos. of Centrifugal Chillers and 2 nos. of Cooling Towers have also been erected.
      • Electrical Works include: Installation of Power & Distribution Transformers, LV Switchgear, and Street Lighting Poles
      • Communication & Data Processing Equipment, Telephone & Inter-com System. Building Automation & Controls and Security Surveillance System were also added.
     
     

     Preparation of Infrastructure for the University City in Dammam Phase 2 & 3, Utility Works (King Faisal University Permanent Campus in Dammam)

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: King Faisal University
    • Type of Project: Infrastructure
    • Value (SR): 51.73 Millions
    • Start Date: Nov. 2003
    • Finish Date: Apr. 2006

    • Work Description: 
      Civil, Mechanical, & Electrical Infra-Structure Works (Extension of Phase 1 Project)


    • The Scope of Work:
      • Site Cleaning with Excavation / Filling of 310,003 cu.mtr. of soil.
      • Construction of Roads with 146 Poles of Street Lights, Walkways, & Parking.
      • Installation of 5.58 KM of Irrigation Piping, and LPG Network of 850 M with Installation of two nos. LPG Tanks of capacity 30,000 gallons & 10,000 gallons.
      • Installed 11.85 KM of Water Distribution Network.
      • Setting up of Sewage Treatment Plant and Installation of 1.32 KM of Sewer Pipe Lines.
      • Installation of 3 Chiller Plants of 1,300 Tons capacity, and 3 nos. Cooling Towers of 3,900 GPM capacity & laying of 2.18 KM of Hydronic Pipes, together with Chilled & Cond. Water Pumps.
      • Added Facilities like: Telephone & Computer Data System, Clock System, MATV, CCTV Surveillance, CCMS / 
        BMS / Fire Alarm System incl. Sprinklers, FM 200 Fire Suppression System & Fire Hydrants.
      • Electrical Works include: Installation of LC Ducts -13.81 KM of dia. 6" PVC for LC System.
      • 4 nos. of 1,500 KVA Generators for Emergency power, 4 nos. Power transformers, 2 nos. MV Switchgear of 40 MVA / 13.8 MV capacity and Installation of 9.5 KM of 15 KV MV Cables. 3 nos. LV Switchgear with Capacitor Bank, MCCs 3 nos., Power & Lighting Panels, Lighting Transformers, 21.33 KM LV Cables, Control Boards, and Photo-Electric Switches for Street Lights.
      • Grounding, Bonding, and Lightning Protection System.
     
     

    Preparation of Infrastructure for the University City in Dammam Phase 1, Utility Works. (King Faisal University Permanent Campus in Dammam)

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. ֠Yuksel Insaat Saudia Co. Ltd.
    • Client: King Faisal University
    • Type of Project: District Cooling & Infrastructure
    • Value (SR): 90.98 Millions
    • Start Date: Sept. 2002
    • Finish Date: Aug. 2005


    • Work Description: 
      Civil, Mechanical, & Electrical Infrastructure Works

    • The Scope of Work:
      • Development of 77 Hectares area with Excavation / Filling of 774,300 cu.mtr. of soil, preparation of 2.60 KM of Slope Embankment.
      • Construction of Roads with 511 poles of street Lights, Walkways & Parking.
      • Construction of 2.75 KM of Storm Drainage System.
      • Installation of 3.47 KM of Irrigation Piping, and LPG Network of 1.94 KM with Installation of two nos. LPG Tanks with total capacity of 46,000 gallons.
      • Setting-up of R.O. Plant of 600 cu. mtr. per day capacity with Water Well, and with 600 cu. mtr. Underground Water Tank, 600 cu. mtr. Sweet Water Tank and 1800 cu. mtr. Raw Water Tank. Also installed 8.96 KM of Water Distribution Network with pipe sizes ranging from dia.: 25 to 315 mm.
      • Setting-up of Sewage Treatment Plant of 1340 cu .mtr. per day capacity and Installation of 4.62 KM of Sewer Pipelines.
      • Installation of 3 Chiller Plants of 1,300 Tons capacity, 3 nos. Cooling Towers of 3,900 GPM capacity & laying of 6.73 KM of underground Pipes, sizes ranging from 150 to 900 mm. dia. Also, 3 nos. of Chilled & Cond. Water Pumps, 8 nos.of AHUs, & 11 Exhaust Fans were installed. Mech. Works also include packages of Storm Water Pumping Station and Sewer Pumping Station.
      • Construction of 'Utility Building' with facilities like: Telephone & Computer Data System, Clock System, MATV, CCTV surveillance, CCMS / BMS / Fire Alarm System incl. Sprinklers, FM 200 Fire Suppression System & Fire Hydrants.
      • Electrical Works include: Installation of 26 KM of uPVC conduits for Elect. Cabling.
      • Emergency Electric Power Sub-station with 2 nos. of 1,500 KVA Generators, Power Transformers, MV Switchgear ofMVA / 13.8 MV capacity and Installation of 38.5 KM of 15 KV MV Cables., LV Switchgear, MCCs, Power & Lighting Panels, Lighting Transformers, 14.7 KM LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
      • Grounding, Bonding, and Lightning Protection System.
      •  

     
    © 2018 FEMCO Faisal Electro-mechanical Co.Ltd