Completed Projects

Building

FEMCO have experienced & engaged with numerous Industrial/Commercial Building Construction projects of various scales, and it dedicates & managed by highly expertise with services of projects management. We emphasize on project execution process maintained & measured with Zero-In-On characteristics for Civil, Architectural, Landscaping, & Finishes activities. FEMCO proactively evaluates projects execution progress with timely regular-basis for uncertainties reduction, monitoring schedules, quality control reports, and submittals/approvals of deliverables. Ultimately, our projects assessment process potentials ensure clients' satisfaction, improve accuracy, competency, efficiency, and archive intended pre-planned profitability.

 

Infrastructure for Housing of University City (Generators Building)

  • Location: Dammam / K.S.A.
  • Contractor:  Faisal Electro-Mechanical Co. Ltd.
  • Client: University of Dammam
  • Type of Project: Building
  • Value (SR): 8.99 Millions
  • Start Date: May 2016
  • Finish Date: Jan. 2018


  • Work Description: 
    Civil & Electrical Work

  • The Scope of Work:
    • Supply & installation all civil work of 1750 sqmt generator building(Excavation, Backfilling, Concrete, Block work, Precast concrete. etc..)
    • Supply, install, connecting and test 1600 LM. Medium-Voltage cables
      • Supply, install, operat and test 2 nos. Medium-Voltage switchgear 13.8 KV, 1250 A.
 
 

Replacement and Development of Infrastructure for Qatif Central Hospital

  • Location: Qatif / K.S.A.
  • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
  • Client: Ministry of Health
  • Type of Project: Building
  • Value (SR): 66.72 Millions
  • Start Date: Feb. 2014
  • Finish Date: Sep. 2017


  • Work Description: 
    Civil, Mechanical & Electrical Replacement Works

  • The Scope of Work:
    • The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.
 
 

 Replacement and Development of Infrastructure for Jubail General Hospital

  • Location: Jubail / K.S.A.
  • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
  • Client: Ministry of Health
  • Type of Project: Building
  • Value (SR): 71.99 Millions
  • Start Date: Feb. 2014
  • Finish Date: Sep. 2017


      • Work Description: 
        Civil, Mechanical & Electrical Replacement Works

        • The Scope of Work:
          • The purpose of this Contract is execution of renovation works such as but not limited to: mechanical works, electrical works, landscaping works, parking lots works. cables, communication system and information technology, internal/external lighting, package substations (transformation station and distribution station), generators, drinking water distribution system, HVAC system, lighting, finishing works, wood works, roads and parking lots organization.
 
 

Supplementation of Infrastructure (Third Phase) (Branch Gate No. 3)

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. – Yuksel Insaat Saudia Co. Ltd.
    • Client: University of Dammam
    • Type of Project: Building
    • Value (SR): 15.69 Millions
    • Start Date: Mar. 2014
    • Finish Date: Aug. 2015


      • Work Description: 
        Civil, Mechanical & Electrical Works

        • The Scope of Work:
          • The purpose of this Contract is execution of infrastructure works for branch gate no. 3. with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.
  •  
     

     Boundary Walls & Gates of the University

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. - Yuksel Insaat Saudia Co. Ltd.
    • Client: University of Dammam
    • Type of Project: Building
    • Value (SR): 33.71 Millions
    • Start Date: Nov. 2012
    • Finish Date: Jun. 2014


    The Scope of Work:
    Electro-mechanical installation works of:
    UOD Hospital area main gate building & 8 km boundary wall with four secondary access gates.
    Civil works such as concrete pilling, concrete structure, precast, boundary wall, providing gate barriers and all finishing
    • Electrical works such as lighting, power distribution, MV equipment's, fire alarm, boundary wall lighting and security CCTV network, telephone & data works
    • Mechanical works such as utility connection to network for potable, seweage & fire water. Package air conditioning & HVAC distribution ducts, storm water network and building plumbing works.
  •  
     

    Equipping the Students Laboratories for the Preparatory Year in the University

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: University of Dammam
    • Type of Project: Building
    • Value (SR): 4.81 Millions
    • Start Date: May 2012
    • Finish Date: Nov. 2012


    • Work Description: 
      Design, providing & Putting services all laboratory furniture's for STEM CELL labs including benches, fume hoods & 
      utilities connections
     
     

    Connection of Buildings of College of Education & Sciences with Girls College in Dammam

    • Location: Dammam / K.S.A.
    • Contractor: Consortium: Faisal Electro-Mechanical Co. Ltd. - Yuksel Insaat Saudia Co. Ltd.
    • Client: University of Dammam
    • Type of Project: Building
    • Value (SR): 33.66 Millions
    • Start Date: Aug. 2010
    • Finish Date: Mar. 2012


    • The Scope of Work:
      • installation 5000 m22 space frame, and 5000 m2 cover of the steel (sandwich panels)
      • Aluminum works cladding 850 m2, windows and sliding doors
      • Civil works (retaining wall and foundations aand column's), cement board 2300 m2 granite 2100 m2, interlock 1500 m2.
      • Supply and installaion of 6 pcs Compacted Air Conditioning Units, 19 tone per unit
      • Spiral round duct single wall inside insulation with the feeding opening and the calibration damper
      • Electrical works compact sub-station 1000Kva for transferring from 13.8Kv to 380V 60Hrtz, MDP, DP, Lighting panel and fire alaram system.
     
     

     Research Centers Project – University City - Dammam

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: University of Dammam
    • Type of Project: Building
    • Value (SR): 21.89 Millions
    • Start Date: Jun. 2010
    • Finish Date: May 2012


    • The Scope of Work: 
      Building of the new campus main gate with 3 secondary gates with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.
     
     

    Project for Infrastructure for Housing of the University City in Dammam – Phase-2

    • Location: Dammam / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: University of Dammam
    • Type of Project: Building
    • Value (SR): 21.89 Millions
    • Start Date: Jun. 2010
    • Finish Date: May 2012

    • The Scope of Work: 
      Building of the new campus main gate with 3 secondary gates with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.
     
     

    RO Maintenance Building at SWCC Jubail

    • Location: Jubail / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Building
    • Value (SR): 3.3 Millions
    • Start Date: Dec. 2002
    • Finish Date: Dec. 2003


    • Work Description: 
      Construction of Workshop Building


    • The Scope of Work:
      • Civil, Elect., & Mech. Works for 1,000 sq. mtrs. Workshop building, including Structural Work.
      • Electrical Works include RMU Sub-station for 13.8 KV and Low Current System.
      • Mechanical Works include HVAC Works for 60 Tons Coolinf capacity.
      • Architectural finishing and Furniture Fit-in.
     
     

    Yanbu Medina Water Transmission System Phase II, Housing Compound

    • Location: Yanbu / K.S.A.
    • Contractor: Yuksel Insaat Saudia Co. Ltd. (Subcontractor: Faisal Electro-Mechanical Co. Ltd.)
    • Client: Saline Water Conversion Corporation (SWCC)
    • Type of Project: Building
    • Value (SR): 45 Millions
    • Start Date: Aug. 1997
    • Finish Date: Jul. 2002


      Work Description: 
      Providing Facilities for Housing Compound (18 Units of 3 Storied Buildings Total 108 Flats)

    • The Scope of Work:
      • Drainage, Plumbing Facilities including Supply and Installation of Sanitary Fixtures
      • Fire Fighting, Potable Water and HVAC System
      • Supply, Installation & Commisioning of Sewage Treatment Plant.
      • Supply & Installation of Elect. Sub-station, Panel Boards, Lighting System, Fire Alaram System, Inter-com 
        System, & Sound System.
      • MV / LV Power Distribution Network.
      • Grounding & Lightning Protection System
     
     

    Al-Sayed Sons Villas External Lighting

    • Location: Riyadh / K.S.A.
    • Contractor: Faisal Electro-Mechanical Co. Ltd.
    • Client: Al – Sayeed & Sons / ICCC
    • Type of Project: Building
    • Value (SR): 1.2 Millions
    • Start Date: Jun. 1996
    • Finish Date: Nov. 1997

    • Work Description: 
      External (Garden) Lighting


    • The Scope of Work:
      • All External Lighting (garden lighting) system; Design, Supply and Installation of three villas.
     